Chapter 2: Server Installation
2-5
Figure 2-1. Installing the Server into a Rack
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The next
step is to install the server into the rack. Do this by lining up the rear of the chas-
sis rails with the front of the rack rails. Slide the chassis rails into the rack rails,
keeping the pressure even on both sides (you may have to depress the locking
tabs when inserting). See Figure 2-1.
When the server has been pushed completely into the rack, you should hear the
locking tabs "click". Finish by inserting and tightening the thumbscrews that hold
the front of the server to the rack.
Summary of Contents for 8025C-3R
Page 1: ...SUPER SUPERSERVER 8025C 3R USER S MANUAL Revision 1 0a...
Page 5: ...v Preface Notes...
Page 22: ...2 8 SUPERSERVER 8025C 3R User s Manual Notes...
Page 26: ...3 4 SUPERSERVER 8025C 3R User s Manual Notes...
Page 63: ...Chapter 6 Advanced Chassis Setup 6 9 Figure 6 6 Removing a Power Supply Module...
Page 64: ...6 10 SUPERSERVER 8025C 3R User s Manual Notes...
Page 90: ...7 26 SUPERSERVER 8025C 3R User s Manual Notes...
Page 96: ...A 6 SUPERSERVER 8025C 3R User s Manual Notes...
Page 102: ...B 6 SUPERSERVER 8025C 3R User s Manual Notes...