Installation
900285-00 12/2016
Innovative Hearth Products
DRT3000 and DRC3000 Series Direct-Vent Gas Fireplaces
32
Installing the Horizontal Termination
NOTE: To help minimize water infiltration install the firestop/spacer (SV4.5HF) on the exterior side of the wall. The
firestop may be caulked with mill base caulk (such as 10K81) or high-temperature silicone.
Figure 27 - Venting Connection and Exterior Wall Recessing of the Horizontal Termination
* Use silicone caulking to seal the
top and sides of the termination,
up to the underlayment, stucco,
or masonry wall surface.
Adaptor
SV4.5RCH
**For thicknesses greater than
9-1/4" (235mm), see
Table 20
.
SV4.5HT-2
Square Termination
Maximum Wall Thickness
9-1/4" (235 mm)**
Exterior Surface of Siding
Exterior Surface of
Framing
6" to 9-1/4"
(152 to 235 mm)**
1-1/4" Maximum Recess of
the Square Termination into
Exterior Finishing Material
SV4.5HT-2
Square Termination
*Caulk
*Caulk
Stucco
Siding
Interior Surface of
Finished Wall
Last Vent Section. Use
Telescopic Vent Section
(SV4.5LA), If Necessary
Maximum Extent of Vent
Run Sections Relative
to Exterior Surface of
Framing