2-1
Chapter 2: System Safety
Chapter 2
System Safety
2-1 Overview
This chapter provides a quick setup checklist to get your chassis up and running.
Following the steps in the order given should enable you to have your chassis set up
and operational within a minimal amount of time. This quick setup assumes that you
are an experienced technician, famailiar with common concepts and terminology.
2-2 Warnings and Precautions
You should inspect the box the chassis was shipped in and note if it was damaged
in any way. If the chassis itself shows damage, file a damage claim with carrier
who delivered your system.
Decide on a suitable location for the rack unit that will hold that chassis. It should
be situated in a clean, dust-free area that is well venilated. Avoid areas where heat,
electrical noise and eletromagnetic fields are generated.
You will also need it placed near at least one grounded power outlet. The SC809
chassis includes one power supply.
2-3 Preparing for Setup
The SC809 chassis includes a set of rail assemblies, including the mounting brack-
ets and mounting screws required to install the system into the rack. Please read
this manual in its entirety before you begin the installation procedure.
2-4 Electrical Safety Precautions
Basic electrical safety precautions should be followed to protect yourself from harm
and the SC809 from damage.
Be aware of the locations of the power on/off switch on the chassis as well
•
as the room’s emergency power-off switch, disconnection switch or electrical
outlet. If an electrical accident occurs, you then can quickly remove power from
the system.
Do not work alone when working with high voltage components.
•