4
INSTALLATION and OPERATION MANUAL
INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL
INSTALLATION and OPERATION MANUAL
1.1. Requirements to water tank
installation room
When choosing a room for tank installation
observe the following requirements:
- to have a drainage channel. Some
maintenance procedures require draining
of all water from the tank.
- Thermal insulation of the room. This
provides efficiency of the appliance and
prevents the water from freezing.
1.2. Requirements for installation.
• The length of connecting pipes between
the water tank and consumer must be as
short as possible.
• Before connecting the boiler to the
installation, check all screw connections
(bolt inspection cover flange, plug and
anode). In very rare cases - during
transportation, loading and unloading
operations - the screw connections may
be loosen.
• Before commissioning, check the
installation for leaks.
• Do not exceed the working pressure of
3 bar.
• If there is a risk of freezing of water in
the tank - drain the tank completely or let
the water heater works continuously.
2. DESCRIPTION OF BUFFER TANK
Accumulates the heat generated by boiler;
recommended for each space-heating
system. Ensures optimum operating
mode of biomass boiler, permitting its
Dear Customers,
This manual contains important
information for the safe and correct
installation, start-up and trouble-free
operation and maintenance of buffer
tank.
Observing the instructions of this
Manual is in the interest of the customer,
and it is one of the guarantee terms and
conditions
.
1. INSTRUCTION TO INSTALLER
The preparation, installation
and commissioning must be
performed by an authorized
installer / service.
During installation and operation, the
country specific requirements and
regulations must be
observed:
• local construction regulations on
installation of water tank; weight of the
boiler to comply with
the stability of the floor of the room
where it will be installed.
• regulations and norms concerning
the fitting of the installation with safety
devices.
• safety during installation - personal
protective equipment
i
Use only original SUNSYSTEM
parts.
Summary of Contents for P 1500
Page 2: ...2 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL ...
Page 8: ...8 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL CONNECTIONS SCHEMES ...
Page 9: ...9 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL ...
Page 13: ...13 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL ...
Page 36: ...36 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 8 SHEMES t 65 C ...
Page 37: ...37 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL ...
Page 38: ...38 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL ...
Page 43: ...INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL ...
Page 44: ...ISO 9001 BUREAU VERITAS Certification tel 359 700 17 343 www burnit bg ...