19
INSTALLATION and OPERATION MANUAL
INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL
INSTALLATION and OPERATION MANUAL
PR2 1500
PR2 2000
PR2 2500
PR2 3000
Capacity
L
1500
2000
2500
3000
Height without insulation / with insulation
H, Hi, mm
2150/2220
2132/2182
2482/2532
2246/2296
Minimal vertical clearance
mm
2220
2220
2542
2332
Diameter without insulation /with insulation
D, mm
Ø 1000/1200
Ø 1200/1400
Ø 1250/1450
Ø 1400/1600
Operating pressure/Max. buffer temperature
bar/
0
C
3/95
3/95
3/95
3/95
Operating pressure /Max. coil temperature
bar/
0
C
16/110
16/110
16/110
16/110
Recommended boiler size, connected to buffer tank
kW
27-50
36-67
46-84
55-100
Weight without insulation/with insulation
kg, kg i
306/329
366/393
400/430
520/555
Sleeve for Electric heating element
В, mm, Rp 1
1/2
”
1130
1170
1170
1184
Heat carrier
С1, mm, Rp1
1/2
”
1808
1775
2126
1797
Heat carrier
С2, mm, Rp1
1/2
”
1305
1420
1474
Heat carrier
С3, mm, Rp1
1/2
”
1085
1170
1420
1184
Heat carrier
С4, mm, Rp1
1/2
”
765
735
735
864
Heat carrier
С5, mm, Rp1
1/2
”
235
230
230
344
Heat carrier
С6, mm, Rp1
1/2
”
Rp1/2”/975
Rp1
1/2
”/1170
Sensor sleeve
А1, mm, Rp1/2”
875
920
920
910
Sensor sleeve
А2, mm, Rp1/2”
1500
1645
1645
1660
Sensor sleeve
А3, mm, Rp1/2”
1525
1625
1625
1590
Sensor sleeve
А4, mm, Rp1/2”
520
500
500
610
Air vent sleeve
F, mm, Rp1
1/2
”
2150
2132
2482
2246
Capacity lower/upper coil S1/S2
S1/S2 L
21/14.8
24.6/14..8
24.6/14.8
29.9/17.1
Heat exchange surface S1/S2
S1/S2 m
2
3.4/2.4
4.0/2.4
4.0/2.4
4.9/2.8
Inlet/Outlet Lower coi S1
S1i/S1o, mm, Rp1”
895/375
980/380
980/380
1082/477
Inlet/Outlet Upper coil S2
S2i/S2o, mm, Rp1”
1635/1225
1645/1285
1889/1525
1660/1310
Summary of Contents for P 1500
Page 2: ...2 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL ...
Page 8: ...8 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL CONNECTIONS SCHEMES ...
Page 9: ...9 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL ...
Page 13: ...13 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL ...
Page 36: ...36 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 8 SHEMES t 65 C ...
Page 37: ...37 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL ...
Page 38: ...38 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL ...
Page 43: ...INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL ...
Page 44: ...ISO 9001 BUREAU VERITAS Certification tel 359 700 17 343 www burnit bg ...