FORM NO. 660769 REV. C
PAGE 15
1-J
Connecting The Hydraulic Lines
Power Pack Completion
4. When ready to install hydraulic lines
from
SwiftShield™
cylinders. Feed lines
through new grommets on back of box.
Connect QDs to the right side of mani-
fold: “
COVER
”
3. Feed hydraulic lines for the
SunLift
™
through grommets,
closest to the battery, on back
of box. Connect QDs on the
left side of manifold: “
LIFT
”
1. Locate white plastic caps on
back of box. Remove and discard.
2. Replace with rubber grom-
mets.
Summary of Contents for SWIFTSHIELD A Series
Page 5: ...FORM NO 660769 REV C PAGE 5 SwiftShield Overview Continued Lines shown disconnected...
Page 8: ...FORM NO 660769 REV C PAGE 8 1 B Remove The contents of the Power Pack box Pump RC Unit Battery...
Page 12: ...FORM NO 660769 REV C PAGE 12 1 F Drill Manifold Mounting Holes Location Of Mounting Holes...
Page 13: ...FORM NO 660769 REV C PAGE 13 1 G Mounting the Pump Note Mount pump using the holes on the left...