Fig. 5 Hydraulic pump station 

attention, 220V motor, the diameter specifications of the power line is not 

less  than  4.0mm

2

,380V  motor  is  not  less  than  2.5mm

2

.  To  ensure  that 

power is not lack of phase, the voltage is normal, and then click UP button (no 

more than 3 seconds), check the motor rotation direction is correct. If rotation is 

right, the oil export pumps out, no oil shows that motor is reversal. Need adjust 

any two position to change the motor rotation direction. 

Connected  to  the  gas  source  according  to  the  pneumatic  system  connection 

diagram

Fig. 4

 

3.6 Pipe connection 

Power on, click UP button to confirm the oil outlet on pipe connector, Refer to 
Fig.3 Hydraulic system connection diagram and Fig.5 hydraulic pump station to 
connect pipes. 

 

 

Fig.4 Pneumatic system connection diagram 

No. 

Name 

Remarks 

Motor 

 

Relief valve 

 

Throttling valve 

 

Cut-off valve 

 

Emergency interface 

 

Pressure gauge   

 

Unloading valve   

 

Balancing valve   

 

pipe connector 

 

10 

pipe connector 

 

11 

Tank 

 

 

No.  Name 

Remarks 

To Air Compre- 

ssor

 

 

Pneumatic FRL

   

Air Valve

 

 

Air

 

connector 

 

Air Cylinder

 

 

 

Summary of Contents for SXJS3018

Page 1: ...E DECK SCISSOR LIFT MANUAL Add No 21 Tongrun Road APEC Industrial Zone Zhifu District Yantai China Tel 0535 6853129 Fax 0535 6853815 http www ythaide com Please read this manual carefully before using...

Page 2: ...rs 4 5 Installation and Adjustment 5 6 Hydraulic System 8 7 Pneumatic system 9 8 Operation 9 9 Maintenance 11 10 Notes 12 11 Common Breakdowns and Solutions 13 12 Qualification Certificate 14 13 Inspe...

Page 3: ...water filter effectively When the lift works people and equipment should keep a certain distance no standing above and under the equipment and the car on lift can not take any staff The weight of the...

Page 4: ...oading bearing stress of sling used for handling should be more than 2 ton c Avoid damager or deformation for equipment during handling d Take suitable protective measurements in case of rain or snow...

Page 5: ...dvantages such as simple structure advanced technology easy operation and safety It is especially suitable for high precision wheel alignment and Auto s repair and maintenance The features as below 1...

Page 6: ...2 1 Main Technical Parameters 2 2 Dimensional Schematic Diagram Fig 2 Chapter 3 Installation and Adjustment 3 1 Installation Environment The lifts should be installed in the indoor environment without...

Page 7: ...n The lift with LOGO side toward the outside Refer to Fig 3 Hydraulic system connection diagram to pave the pipe but not connected in the ditch make certain protection to pipe connector 3 4 Infuse hyd...

Page 8: ...osition to change the motor rotation direction Connected to the gas source according to the pneumatic system connection diagram Fig 4 3 6 Pipe connection Power on click UP button to confirm the oil ou...

Page 9: ...fall in the same lock tooth Adjust the space around the lifts well Refer to Fig 2 Use a bolt to bore the bolt 14 holes in the ground Put in the bolts but not expanded Use a leveling tool to make sure...

Page 10: ...ction for too long time the gear pump could be damaged Fig 6 Hydraulic system diagram Chapter 5 Pneumatic System The connection of the pneumatic system refer to Fig 4 The schematic of the pneumatic sy...

Page 11: ...nd place the platform to the lowest location Then release the descending button 6 5 Drive a vehicle on the lifts Put rubber pads under the vehicle Make sure the lift points is directly to the rubber p...

Page 12: ...mes of using longest 2 years Release the used oil thoroughly Clean the oil tank and oil filter Fill in enough oil Check the oil level regularly Do not let anything dirt falls in the oil tank in case t...

Page 13: ...d Do not change the time setting of the time relay 8 7 The lock must be released before repairing or testing The protection lock must be released very well 8 8 If the power off suddenly when the facil...

Page 14: ...e button 2 The electromagne tic valve doesn t work 3 The control valve Is jammed 1 Check or change the button 2 Check the electromagnetic valve and the relative lines 3 Clean it 6 There is pressure in...

Page 15: ...is qualified according to the delivery inspection Dimension mm mm mm Product Number Corporate Representative Inspected by Date Yantai Haide Science And Technology Co Ltd Add No 21 Tongrun Road APEC I...

Page 16: ...ection items and results before sending out of factory are as follows No Inspection items unit Standard Value measured value 1 Lifting height mm 2000 2 Lifting capacity Kg 3000 3 System pressure Mp 25...

Page 17: ...n Lifting Platform SXJS3018 2 2 Rubber Pad 4 3 Electrical Control Box Assembly 1 4 Pneumatic FRL 1 5 Compound Pad 14 8 6 Expansion Bolt M16 120 8 7 Gasket 16 8 Plastic band 10 9 Inspection Report 1 10...

Page 18: ...16 SXJS3018 DOUBLE DECK SCISSOR LIFT Figure I Electric Schematic Diagram...

Page 19: ...17 SXJS3018 DOUBLE DECK SCISSOR LIFT Figure II Foundation Installation Diagram...

Reviews: