SXJS3018 DOUBLE-DECK SCISSOR LIFT
Fig. 3 Hydraulic system
connection diagram
3.2 Foundation preparation
Refer to dimension layout Fig.2 and Foundation Installation Diagram Figure II
for foundation preparation. Thickness (strength) and level of concrete is
important. Don
’
t rely much on machine adjustment on level. Under good
geological conditions, the thickness of the concrete foundation is above
150mm, and recommended thickness 180mm-200mm. Total length of level
degree
≤
5mm
。
The location of the control cabinet can be interchanged on left or right.
3.3 Equipment complete
Place the equipment on the flat ground, the lift without pulling head will be in
same place with car head after driving car on. The lift with LOGO side toward
the outside. Refer to Fig.3 Hydraulic system connection diagram to pave the
pipe but not connected in the ditch, make certain protection to pipe connector.
3.4 Infuse hydraulic oil
Infuse enough hydraulic oil in tank of control cabinet (About 16L). Recommend
46# anti-wear hydraulic oil. Note: viscosity of hydraulic oil is higher in winter for
lower temperature, so falling speed of lift with no load could be too slow. 32# or
40# hydraulic oil is more suitable in winter.
3.5 Power and gas supply connection
According to the electrical schematic diagram (refer to Figure I) to connect
power line, control cabinet need be reliable grounding.
Requires special
No.
Name
Remarks
1
Adjusting level
control tube
3200mm
2
Main Cylinder
control tube
3200mm
3
Oil tube of top
cavity for Main
cylinder
350mm
4
Oil tube of
bottom for vice
cylinder
1800mm
A
Main cylinder
B
vice-cylinder