56 Broome Corporate Parkway
Conklin, NY 13748 USA
P 877.786.6299 | F 877.786.0329
www.sunmaxxsolar.com
Page 18 of 47
5.3.2 Installation of the tank:
Fig 1
Fig 2
Fig 3
Step 1. Screw
off the nuts
from the connection bolts
of the water tank. Take the
water tank out. Put it on
the well-installed frames
slowly and lightly.
Attention that insert the
bolts of the water tank
into the corresponding
connecting holes of the
tank brackets.
Step
2.
Install
the
accessories and revolve
the small red cap of the
air vent on the top to
ventilate.
.
Step 3.
Install the T.P
valve.
5.3.3 Installation of the heat pipe and vacuum tubes
Step 1.
Firstly sheathe the anti-dust circles onto the vacuum tube.
Step 2.
Take the adjustable tail stocks down.
Step 3.
Pull the heat pipe out of the vacuum tube about 20 centimeters.
Step 4.
Sheathe the white Teflon gasket into the heat pipe and put it onto the convex
of the copper circle.