56 Broome Corporate Parkway
Conklin, NY 13748 USA
P 877.786.6299 | F 877.786.0329
www.sunmaxxsolar.com
Page 16 of 47
Step 1.
Take the tail stock track out and
put it under the frame. Open the screw
bag, finding the bolts that match the
connecting holes to connect the tail
stock track with front legs.
Step
2. Take the reflectors out and connect
them with front legs by bolts and nuts.
Attention: the reflector near to the tail
stock track should not be installed now so
as to operate more easily in the installation
of the rear legs and assistant bars.
Fig 3
Fig 4
Step 3.
Find the tank brackets and
connect them with rear legs.
Attention:
The installation of the three tank
brackets is the key point; observe
carefully so as to avoid the faulted
installation.
Step 4.
Take the rear side legs out and
connect them with the corresponding
connecting holes of the tank brackets by
bolts. Observe carefully how the rear side
legs are collected with the tank brackets.
Fig 5
Fig 6
Step 5.
Connect the front legs with rear
legs by assistant bars, pay attention to
the length order of assistant bars. Take
Step 6.
Take the cross bars out that are
used to fasten the rear legs, group them
together first. Connect the cross bars