© 2021 Sunman (Zhenjiang) Company Limited
。
All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page18 / 20
TM
6.4.7
Wiring and testing
Before wiring, measure the open circuit voltage and short circuit current of the
single module, record it; connect all the modules in the string in series, measure the
string voltage, and the string voltage is equal to the sum of the open circuit voltages of
the modules;