SG2K5TL/SG3KTL/SG4KTL-31
User Manual
2
z
Install the inverter onto the wall
z
Connect inverter into the PV power system
z
Connect other devices into the PV power system
z
Commission the inverter
z
Maintain and service the inverter
Before Installation
There is a risk of injury due to improperly handling the device!
z
Always follow the instructions contained in the manual when moving and
positioning the inverter.
z
The weight of the equipment can cause injuries, serious wounds, or
bruising if it is not handled correctly.
During Installation
Prior to installing the inverter onto the wall, it is crucial to make certain that the inverter
is not electrically connected.
System performance loss due to bad ventilation!
The equipment requires good quality ventilation during operation. It is essential
to keep the unit upright and nothing covering the heat sink in order to ensure
that the equipment interior is well cooled down.
During Electrical Connection
Lethal voltage exists!
PV arrays will produce electrical energy when exposed to sunlight and thus can
create an electrical shock hazard.
z
Wiring of the PV arrays should only be performed by qualified personnel.
z
PV modules should be covered by opaque materials during wiring.
Summary of Contents for SG2K5TL
Page 2: ......
Page 6: ......
Page 10: ...IV...
Page 16: ...SG2K5TL SG3KTL SG4KTL 31 User Manual 6...
Page 60: ...SG2K5TL SG3KTL SG4KTL 31 User Manual 50 10 3 Overview of Complete LCD Menu Fig 10 1 Menu Tree...
Page 76: ...66 Temperature Derating Curve 1 0 2 45 60 Pnom P U Ambient temperature C...
Page 79: ......