User Manual
56
PV+ PV-
PE
PV+
PV-
PE
When accessing the positive and negative cable, it is necessary to
ensure the insulation requirements between the positive access and
the negative access. Once positive and negative inputs are
short-circuited, it can cause unrecoverable damage to the inverter.
Sungrow shall hold no liability for any possible consequences caused
by ignorance of this warning.
Check the positive and negative polarity of the PV cells. After
confirmation, you can insert the DC connectors into the input
terminals on the bottom of the inverter.
For the connection to the same MPPT, reversing the polarity of a
single string is prohibited. A permanent failure of the system or
inverter may occur.
Step 6
Pull the cable gently to make sure it is secured.
Step 7
Connect other PV strings following the above-mentioned procedures.
Step 8
Seal the gaps between the DC cable and the gland inside the lower part of
the cabinet with duct seal.
Seal the gap between the cable and the gland
/
conduit
with duct seal
or other suitable materials to prevent the entry of foreign bodies or
Summary of Contents for SG125HV
Page 2: ......
Page 11: ...IX 11 4 Contact Information 109...
Page 12: ......
Page 24: ...1 Safety Instructions User Manual 12 service d utilisateur avant l utilisation...