31
5
Mechanical Installation
5.1
Installation Site Selection
Select an optimal installation site for safe operation, long service life and
outstanding performance.
Take the load capacity of the wall into account. The wall (concrete wall or
metal frame) should be strong enough for the weight of the inverter over a
long period.
Install the inverter in a convenient location for electrical connection,
operation and maintenance.
Do not install the inverter on the wall
made up of flammable materials.
material
Flammable wall
Do not install the inverter near
flammable materials or gas.
Flammable material or
gas near the installation
Summary of Contents for SG125HV
Page 2: ......
Page 11: ...IX 11 4 Contact Information 109...
Page 12: ......
Page 24: ...1 Safety Instructions User Manual 12 service d utilisateur avant l utilisation...