Instruction and Operation Manual
50
STEP 26
Install upper process seal rotating face.
STEP 27
Install the lower process seal shaft sleeve.
Install two 936J o-rings, one on the top of the
sleeve and one on the bottom.
STEP 28
Install the lower process seal and 936H o-
ring.
Note: Torque process seal hex head screws
to 95-102 in-lbs.
STEP 29
Install lower mating ring, o-ring 936G, and
impeller spacer 158C.
STEP 30
Install impeller o-ring 936G.
Note: Use petroleum jelly to hold the o-ring in
position.
Summary of Contents for LMV-313
Page 1: ...SUNDYNE LMV 313 PUMPS Instruction and Operation Manual August 2007 ...
Page 36: ...Instruction and Operation Manual 32 Figure 15 Inducer Housing Shim Adjustment ...
Page 40: ...Instruction and Operation Manual 36 Figure 17 Service Check Points ...
Page 69: ...Instruction and Operation Manual 65 Figure 22 Gearbox Components ...
Page 70: ...Instruction and Operation Manual 66 Figure 23 Pump Nomenclature ...
Page 71: ...Instruction and Operation Manual 67 Figure 24 Exploded View ...
Page 72: ...Instruction and Operation Manual 68 Shaft Assemblies Figure 25 Shaft Assemblies ...