9
INSTALLATION INSTRUCTIONS (continued)
INSTALLING THE KEG COUPLER
Insert the provided keg coupler into the locking neck of the beer keg and turn it clockwise to lock into
position, making sure the keg coupler is in the closed position.
•
INSTALLING THE CO
2
AIR LINE HOSE
Attach the end of the provided air line hose (red) to the hose connection on the keg coupler.
Secure hose by using the connector and make sure there are no leaks.
•
•
INSTALLING THE BEER TOWER TO COUPLER
Make sure the washer is properly inserted into the wing nut.
Place wing nut into the top of the coupler turning until tight.
•
•
INSTALLING THE CO
2
CYLINDER MAIN VALVE
Make sure the secondary shut-off valve is closed.
To open the main CO
2
cylinder valve, slowly turn the main valve counter-clockwise until fully open.
The needle on the gauge will start to climb.
•
•
•
ADJUSTING THE CO
2
REGULATOR
Release the adjustment lock nut.
Using a
fl
at screwdriver, turn the regulator screw. If you want to increase the low pressure, rotate
screw clockwise. By rotating it counter clockwise, low pressure will be decreased.
When the required operating pressure is attained, retighten lock nut.
Open secondary shut off valve to let CO
2
fl
ow into the keg.
•
•
•
•