![Sun Microsystems SPARCcenter 2000E Installation Manual Download Page 36](http://html1.mh-extra.com/html/sun-microsystems/sparccenter-2000e/sparccenter-2000e_installation-manual_1392454036.webp)
2-20
SPARCserver 2000E Power Supply Installation Manual—April 1995
2
2.6 Restarting the System
Note – As the system starts up, watch for error messages from the POST
diagnostic program. If a terminal is not already part of the system, install a
TTY terminal before continuing the start up. See the SPARCcenter 2000
Installation manual for terminal settings.
1. The system key switch must be turned to
(the standby position).
See Figure 2-1.
Caution – The outlet must be a 200-240 Vac 30-ampere circuit, intended solely
for use by the server cabinet, as described in the site preparation instructions in
the SPARCcenter 2000 Installation manual. The electrical receptacle must be
grounded, and the grounding conductor serving this receptacle must be
connected to the earth ground at the service equipment.
2. Turn the Local/Remote switch down, to
Local
. See Figure 2-20.
3. Turn on the power switch on the AC distribution unit.
See Figure 2-2.
4. Turn on power to the terminal.
A terminal is required for viewing system messages.
5. Turn the key switch to
(the power-on position). See Figure 2-1.
Several things will happen:
•
The DC-powered blower fan in the top of the cabinet begins turning.
•
The left front panel LED (green) turns on immediately to indicate the DC
power supply is functioning.
•
The middle front panel LED (yellow) lights immediately and should turn
off after approximately 60 seconds.
•
The right front panel LED (green) lights after POST has ended to show
that booting is successful.
•
The terminal beep indicates that the system is ready.
•
The terminal screen lights up upon completion of the internal self test.
!
Summary of Contents for SPARCcenter 2000E
Page 7: ...vii Tables Table 1 1 Safety Precautions 1 2 Table 2 1 LED Status Indicators 2 25 ...
Page 8: ...viii SPARCserver 2000E Power Supply Installation Manual April 1995 ...
Page 42: ...2 26 SPARCserver 2000E Power Supply Installation Manual April 1995 2 ...
Page 50: ...A 8 SPARCserver 2000E Power Supply Installation Manual April 1995 A ...
Page 51: ...RevisionHistory Revision Dash Date Comments 802 2700 10 A April 1995 First Customer Ship ...
Page 52: ...SPARCserver 2000E Power Supply Installation Manual April 1995 ...