
2-12
SPARCserver 2000E Power Supply Installation Manual—April 1995
2
5. Install the bottom cover panel.
Position the panel Part No. 340-3190-xx and install 12 screws
Part No. 240-1372-xx to secure the panel to the cabinet. See Figure 2-11.g
Figure 2-11 Installing the Bottom Cover Panel
2.5.2.3 Main Bus Bar Installation
Install the main bus bar Part No. 340-3136-xx to connect the top and bottom
power supply busses.
1. Orient the bus bar as shown in Figure 2-12.
2. Place the bus bar flush against the top and bottom power supplies so
holes in the tabs slide over all bolts on the supplies: eight on the top
supply and eight on the bottom.
3. Loosely install in the order given the following on each bolt: a flat washer,
a lock washer and a nut.
See Figure 2-12.
4. Loosely install four M6 screws through holes in the bus bar to secure the
bus bar to the top and bottom cover panels.
The screw Part No. is 240-2083-xx. See Figure 2-12.
5. Tighten all nuts and screws installed in Step 3 and Step 4.
Bottom cover panel
Part No. 340-2190-xx
Screws (12 places)
Summary of Contents for SPARCcenter 2000E
Page 7: ...vii Tables Table 1 1 Safety Precautions 1 2 Table 2 1 LED Status Indicators 2 25 ...
Page 8: ...viii SPARCserver 2000E Power Supply Installation Manual April 1995 ...
Page 42: ...2 26 SPARCserver 2000E Power Supply Installation Manual April 1995 2 ...
Page 50: ...A 8 SPARCserver 2000E Power Supply Installation Manual April 1995 A ...
Page 51: ...RevisionHistory Revision Dash Date Comments 802 2700 10 A April 1995 First Customer Ship ...
Page 52: ...SPARCserver 2000E Power Supply Installation Manual April 1995 ...