
Chapter 1
Installation
7
▼
To Route the Power Cords
■
Tools: None
■
Equipment: AC power cords (shipped with controller module)
1. Retrieve the power cords from the controller module shipping container.
2. Facing the back of the cabinet, plug the power cords into AC power sequencer
outlets in the cabinet as follows:
a. If your cabinet has two AC power sequencers, plug in one power cord into each
power sequencer.
Use the two power cords with vertical prongs on each end. These cords are
identical, so you can plug either one into each power sequencer.
Note –
The cords must be plugged into one or more of the four bottom outlets to
ensure that the controller module is powered on after the disk drive trays.
b. If your cabinet has one AC power sequencer, plug the Y-shaped power cord
into the power sequencer.
Plug the single end (three-prong) into one of the four bottom outlets on the power
sequencer. The double-plug ends will be plugged into the controller module later
(
FIGURE 1-5
).
FIGURE 1-5
Outlets on AC Power Sequencers
3. Route the other end of the power cords through the cable access hole in the
support structure (
FIGURE 1-6
).
Leave the power cords draping out of the access hole; they will be plugged into the
controller module later.
Plug cords into
bottom outlets
only