Working with Portal Server Building Modules
Chapter 5
Creating Your Portal Design
95
Redundancy is equally important to the directory master so that profile changes
through the administration console or the Portal Desktop, along with consumer
replication across building modules, can always be maintained. Portal Server and
Access Manager support MMR. The NSPOF scenario uses a multi-master
configuration. In this configuration, two suppliers can accept updates, synchronize
with each other, and update all consumers. The consumers can refer update
requests to both masters.
SRA follows the same replication and load balancing pattern as Portal Server to
achieve NSPOF. As such, two SRA Gateways and pair of proxies are necessary in
this scenario. The SRA Gateway detects a Portal Server instance failure when the
instance does not respond to a request after a certain time-out value. When this
occurs, the HTTPS request is routed to a backup server. The SRA Gateway
performs a periodic check for availability until the first Portal Server instance is up
again.
The NSPOF high availability scenario is suitable to business critical deployments.
However, some high availability limitations in this scenario might not fulfill the
requirements of a mission critical deployment.
Summary of Contents for Portal Server 6 2005Q1
Page 8: ...8 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 10: ...10 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 12: ...12 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 20: ...Sun Welcomes Your Comments 20 Portal Server Secure Remote Access 6 2005Q1 Administration Guide...
Page 36: ...A Typical Portal Server Installation 36 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 50: ...Proxylet 50 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 78: ...SRA Sizing 78 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 132: ...Identity and Directory Structure Design 132 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 142: ...Configuration Files 142 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 152: ...Tuning Parameters for etc system 152 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 178: ...Portal Design Task List 178 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 182: ...182 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 192: ...Section X 192 Portal Server 6 2005Q1 Deployment Planning Guide...