SRA Sizing
76
Portal Server 6 2005Q1 • Deployment Planning Guide
•
Regular-JSP. Describes a configuration of two tabs with seven channels each.
•
Heavy—JSP. Describes a configuration of three tabs with seventeen channels
each.
Scalability
You can choose between one, two, and four CPUs per Gateway instance. The
number of CPUs bound to a Gateway instance determines the number of Gateway
instances required for the deployment.
Secure Portal Pilot Measured Numbers
If you have numbers from a pilot of the SRA portal, you can use these numbers in
the Gateway sizing tool to arrive at more accurate results. You would fill in the
following:
•
Measured CPU Performance. The values used to help calculate the number of
Gateway instances include:
❍
Initial Portal Desktop Display, hits per second per CPU
❍
Portal Desktop Reloads, hits per second per CPU
•
Netlet Applications Block Size. This value specifies the Netlet application byte
size. The Netlet dynamically determines the block size based on the application
that is used. Block size determined by Netlet for a Telnet is based on the
amount of data transferred.
SRA Gateway and SSL Hardware Accelerators
SSL-intensive servers, such as the SRA Gateway, require large amounts of
processing power to perform the encryption required for each secure transaction.
Using a hardware accelerator in the Gateway speeds up the execution of
cryptographic algorithms, thereby increasing the performance speed.
The Sun Crypto Accelerator 1000 board is a short PCI board that functions as a
cryptographic co-processor to accelerate public key and symmetric cryptography.
This product has no external interfaces. The board communicates with the host
through the internal PCI bus interface. The purpose of this board is to accelerate a
variety of computationally intensive cryptographic algorithms for security
protocols in e-commerce applications.
NOTE
You do not need to specify the Page Configuration and Scalability
options if you are using trial deployment numbers.
Summary of Contents for Portal Server 6 2005Q1
Page 8: ...8 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 10: ...10 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 12: ...12 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 20: ...Sun Welcomes Your Comments 20 Portal Server Secure Remote Access 6 2005Q1 Administration Guide...
Page 36: ...A Typical Portal Server Installation 36 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 50: ...Proxylet 50 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 78: ...SRA Sizing 78 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 132: ...Identity and Directory Structure Design 132 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 142: ...Configuration Files 142 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 152: ...Tuning Parameters for etc system 152 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 178: ...Portal Design Task List 178 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 182: ...182 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 192: ...Section X 192 Portal Server 6 2005Q1 Deployment Planning Guide...