SRA Sizing
Chapter 4
Pre-Deployment Considerations
75
Advanced Gateway Settings
Use the settings in this section to obtain more accurate results when estimating the
number of Gateway instances for your deployment. These advanced Gateway
settings are used as input to the automated sizing tool.
These are the advanced Gateway settings:
•
Page Configuration
•
Scalability
•
Secure Portal Pilot Measured Numbers
Page Configuration
If you are using an authenticated portal, you must specify both Login Type and
Desktop Type in the page configuration section of the automated sizing tool
•
Login Type
. Describes the type of portal page (content configuration and
delivery method) that end users initially see after submitting user name and
password. This process s typically taxing on the system because the process
involves checking credentials, initializing the session, and delivering initial
content.
The Measured CPU Performance characteristic associated with the Login Type
is the Initial Desktop Display variable.
•
Desktop Type
. Describes the type of portal pages (content configuration and
delivery method) that end users see after the initial portal page. These pages
are displayed with each subsequent interaction with the portal, or on Desktop
refresh. Because the session has already been established and cached content
can be exploited, less system resources are typically required and the pages are
delivered more rapidly.
The Measured CPU Performance characteristic associated with the Desktop
Type is the Desktop Reload variable.
For both Login Type and Desktop Type, select the appropriate content
configuration:
•
Light-JSP. Describes a configuration of two tabs with five channels each.
NOTE
After your technical representative has given you a figure for your
estimated number of CPUs, consider how these related performance
factors affect this figure.
Summary of Contents for Portal Server 6 2005Q1
Page 8: ...8 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 10: ...10 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 12: ...12 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 20: ...Sun Welcomes Your Comments 20 Portal Server Secure Remote Access 6 2005Q1 Administration Guide...
Page 36: ...A Typical Portal Server Installation 36 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 50: ...Proxylet 50 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 78: ...SRA Sizing 78 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 132: ...Identity and Directory Structure Design 132 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 142: ...Configuration Files 142 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 152: ...Tuning Parameters for etc system 152 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 178: ...Portal Design Task List 178 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 182: ...182 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 192: ...Section X 192 Portal Server 6 2005Q1 Deployment Planning Guide...