netstat
148
Portal Server 6 2005Q1 • Deployment Planning Guide
•
errs
- errors. The presence of errors could indicate device errors. If your
network is switched, errors indicate that you are nearly consuming the
bandwidth capacity of your network. The solution to this problem is to give the
system more bandwidth, which can be achieved through more network
interfaces or a network bandwidth upgrade. This is highly dependent on your
particular network architecture.
Considerations
•
If network saturation is occuring quickly (saturation at less than 8CPUs for an
application server running on a 100mbit Ethernet), then an investigation to
ensure conservative network usage is a good first step.
•
Increase network bandwidth. Steps that possibly can be taken: upgrade to a
switched network, more network interfaces are a possible solution or upgrade
to a higher bandwidth network to accommodate your network traffic
demand.netstat
-sP tcp
These
netstat
options are used to analyze the TCP kernel module. Many of the
fields reported represent fields in the kernel module that indicate bottlenecks.
These bottlenecks can be addressed using the
ndd
command and the tuning
parameters referenced in the
/etc/inet
netstat -sP tcp Output
#netstat -sP tcp
TCP tcpRtoAlgorithm = 4 tcpRtoMin = 400
<snip>
tcpInDupSegs = 1144 tcpInDupBytes =132520
tcpInPartDupSegs = 1 tcpInPartDupBytes = 416
tcpInPastWinSegs = 0 tcpInPastWinBytes = 0
tcpInWinProbe = 46 tcpInWinUpdate = 48
tcpInClosed = 251 tcpRttNoUpdate = 344
tcpRttUpdate =1105386 tcpTimRetrans = 989
tcpTimRetransDrop = 5 tcpTimKeepalive = 818
tcpTimKeepaliveProbe= 183 tcpTimKeepaliveDrop = 0
Summary of Contents for Portal Server 6 2005Q1
Page 8: ...8 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 10: ...10 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 12: ...12 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 20: ...Sun Welcomes Your Comments 20 Portal Server Secure Remote Access 6 2005Q1 Administration Guide...
Page 36: ...A Typical Portal Server Installation 36 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 50: ...Proxylet 50 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 78: ...SRA Sizing 78 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 132: ...Identity and Directory Structure Design 132 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 142: ...Configuration Files 142 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 152: ...Tuning Parameters for etc system 152 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 178: ...Portal Design Task List 178 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 182: ...182 Portal Server 6 2005Q1 Deployment Planning Guide...
Page 192: ...Section X 192 Portal Server 6 2005Q1 Deployment Planning Guide...