4-1
C H A P T E R
4
Returning the Server to Service
This chapter contains the tasks to perform after replacing components within the
server.
4.1
Returning the Server to Service
After replacing components inside of the server, perform the following tasks:
■
“Install the PCI Mezzanine” on page 4-1
■
“Install the Air Baffle” on page 4-4
■
“Install the Top Cover” on page 4-4
■
“Reinstall the Server in the Rack” on page 4-5
■
“Reconnect the Cables to the Server” on page 4-5
■
“Power On the Server” on page 4-6
When replacing some of the components, not all of these tasks are necessary. The
replacement procedures for those components address this fact.
▼
Install the PCI Mezzanine
If you removed the PCI mezzanine to service another component, use the
instructions in this section to install the PCI mezzanine.
1. Ensure that all three of the PCI riser cards are fully seated in the motherboard.
2. Align the mezzanine with the chassis, and lower it gently into the chassis.
Do not force the mezzanine down. Use the securing levers to seat the mezzanine
fully into the chassis.