Chapter 2
Hardware Installation
2-15
FIGURE 2-7
Installing Node Blade Server Into Chassis Slot
6. Taking care to keep the blade server aligned in the guides, slide the blade
server in until the injector/ejector latches engage the card cage.
7. Push the blade server slightly into the midplane connectors, and then close the
latches to seat the blade server in the connectors (
).
When the lower latch is closed, the blue Hot-Swap LED blinks while the blade
server is initializing. The blue LED turns off and the green OK LED lights when
the blade server is ready.