7
C.
Wiring
1)
Connect to appropriate power supply, the voltage should comply with the rated
voltage of the products.
2)
Earth the machine well.
3)
Wiring must be handled by a professional technician according to the circuit
diagram.
4)
Set leakage protector according to the local code for wiring (leakage operating
current ≤ 30mA).
D.
Switch on after finishing all wiring construction and re-checking.
Summary of Contents for 12.5 Si
Page 1: ...INVERTER SWIMMING POOL HEAT PUMP ...
Page 2: ......
Page 18: ...15 XI Appendix 1 Heating priority Optional ...
Page 19: ...16 XII Appendix 2 Heating priority Optional ...
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ...Version Cb9IN 1 ...