5
1.4
Complete pump overhaul
A complete overhaul of the pump should be carried out if there has been water or oil in the motor housing or if
the pump has been in daily operation for more than a year. At low utilization of the pump the overhaul intervals
can be extended. For complete overhaul follow the workshop manual and dismantle the pump completely,
replace damaged and worn parts. Use only Sulzer spare parts.
Spare part lists are available in the download section of the Sulzer website at www.sulzer.com.
1.5
Cleaning of pump before service
Before overhaul or maintenance is started the pump should be cleaned. High pressure water is recommend-
ed. If the pump has been operating in tough applications additional solvents can be used. To clean the pump
from lime deposits it is recommended to lower the pump in a bath containing formic acid (15%) and 85% water
for some hours. If needed leave the pump longer. Clean the pump again with high pressure water. Another
example is to use Beto 2000 which is a solvent for concrete deposits.
1.6
Recycling in case of scrapping the pumps
Recycling of individual pump parts are beneficial to the environment. The pump can be fully dismantled for
recycling. Aluminium, stainless steel, ductile iron and high chrome cast iron can be recycled when a pump is
scrapped. Wear parts which consists of rubber/polyurethane/aluminium/steel and cables/stators with copper
must be treated before recycling is possible. Environmental white oil should be left to designated areas.
Summary of Contents for J 205
Page 30: ...30 11 Sectional drawing Tools J 205 ...
Page 31: ...31 J 405 ...
Page 32: ...32 J 604 ...
Page 37: ...37 ...