BEFORE START-UP
Pages
• A
Recommendations for use
14-15
START-UP
Pages
• A
Preparing the machine
16-17
• B
Handling
16-17
• C
Hitching to the cultivator
18-19
• D
Hydraulic Connection
20-21
• E
Electrical connection
22-23
• F
Fan
24-25
• G
Tractor control
28-29
• H
Road transport
32-33
• I
Cultivating without drilling
34-35
• J
End of field manoeuvres
34-35
• K
Loading platform
36-37
• L
Filling the hopper
38-39
SETTINGS
Pages
• A
Setting the flow
40-41
• B
Markers
42-45
• C
Depth control
46-47
• D
Adjusting the covering harrow
48-49
• E
Disengaging the half drill
50-51
• F
Tramlining
50-53
MAINTENANCE
Pages
• A
Verification
54-55
• B
Removing-reinstalling the doser
56-57
• C
Cleaning
58-59
• D
Lubrication
58-59
• E
Technical specifications
60-61
• F
Sticker positions
62-63
• G
Storage
64-65
• H
Emptying the hopper
64-65
ACCESSORIES
Pages
• A
Areameter
66-67
• B
Depth wheel scraper
68-69
• C
Hopper lighting and working lights
68-69
SETTING CHARTS
Pages
• A
Setting charts
70-71
Eng
lis
h
CO
NT
ENT
S
Read the manual carefully before use. For English follow the symbol.
EN
1
2
3
4
5
6
Summary of Contents for XEOS PRO
Page 2: ......
Page 22: ...1 E 22 Mise en route Start up Inbetriebsetzung...
Page 46: ...1 IIII IIII III III II II I I C 46 R glages Settings Einstellungen...
Page 48: ...3 4 2 1 D 48 R glages Settings Einstellungen...
Page 54: ...1 A 54 Entretien Maintenance Wartung...
Page 56: ...B 56 Entretien Maintenance Wartung...
Page 60: ...E 60 Entretien Maintenance Wartung...
Page 62: ...F 62 Entretien Maintenance Wartung...
Page 66: ...A 66 Equipements Accessories Ausr stungen...