
Appendix C:
Toroidal Transformer Replacement
56
Appendix C: Toroidal Transformer Replacement (FL17E International Series)
Required Tools:
Phillips Screwdriver
Ratchet and 1/2” Socket
Cutting Pliers
Nylon Cable Tie (1)
Replacement Procedure:
1. Run the bed fully up and apply the brakes.
2. Run the head section fully up using the foot end control panel command.
3. Unplug the bed power cord.
4. Using a Phillips screwdriver, remove the fourteen screws (A) holding the head casing cover.
Remove the cover.
5. Using side-cutting pliers, cut the cable tie holding together the cables.
6. Using a 1/2” socket and ratchet, remove the locknut and washer (B) holding the transformer
to the head casing.
N
N
O
O
T
T
E
E
A light tightening is enough for the locknut.
7. Gently remove the transformer from its location.
8. Disconnect the two transformer cables (C) and remove the defective transformer (D).
9. Reverse the preceding steps to install the replacement transformer (P/N QDF14-1160).
10. Check the bed electric functions at the foot end and the siderail control panels before
returning the bed to service.
A
B
C
D
Summary of Contents for GOBED FL17E
Page 2: ......