28EX-009-002 REV B
1-51
En
gli
sh
POWER CORD CONNECTOR REPLACEMENT
Tools Required:
•
#1 Phillips Screwdriver
•
#2 Phillips Screwdriver
Procedure:
Note
Unless otherwise indicated, refer to Figure 12,
,for reference for this procedure .
1 . Raise the bed to the highest position and apply the brakes .
2 . Unplug the bed power cord from the wall outlet .
3 . Remove the power cord from the power connector and disengage it from the wire clip .
4 . Properly ground yourself (see “Grounding Diagram”,
) .
5 . Using a #2 Phillips screwdriver, remove the six screws holding the cover (A) to the litter . Keep the cable clips .
6 . Once the screws are removed, pivot the cover and lay it flat on the bottom of the litter (see opposite illustration) .
7 . Remove all cables connected to the power cord connector . Note the location of the cables in order to properly
reconnect them later . Refer to drawing OL280118,
, or OL280119,
, for the connecting position
of the cables on the power connector .
8 . Turn the cover to a vertical position . Using a #1 Phillips screwdriver, remove the two screws (B) holding the power
connector to the cover .
9 . Unplug the connector and remove it .
Note
Ensure the proper size fuses are used in the new power cord connector before installing it .
10 . Reverse the above steps to install the new power cord connector .
11 . Test all the bed functions before returning the bed to service .
Service Information
Summary of Contents for FL28EX
Page 2: ......
Page 83: ...www stryker com 28EX 009 002 REV B 1 81 Return To Table of Contents English Notes ...
Page 99: ...www stryker com 28EX 009 002 REV B 1 97 Return To Table of Contents English Notes ...
Page 162: ......
Page 257: ...www stryker com 28EX 009 002 REV B 2 95 Retour à la table des matières Français Commentaires ...
Page 320: ......
Page 321: ......