1-62
28EX-009-002 REV B
En
gli
sh
CPR ACTIVATION CABLE REPLACEMENT (OPTIONAL)
Tools Required:
•
7/16” Combination Wrench
Note
Unless otherwise indicated, refer to Figure 17,
, for this procedure .
Procedure:
1 . Raise the bed to the highest position and apply the brakes .
2 . Remove the head section plastic cover (if equipped) or raise the head section completely .
3 . Remove the head board .
4 . Unplug the power cord from the wall outlet .
5 . Using a 7/16” combination wrench, remove the nut, sleeve and bolt (D) holding both ends of the activation cable
to the fixed lever .
6 . Using a 7/16” combination wrench, remove the nut, washer (E) holding the cable jacket to the mobile lever . Remove
the cable from the lever and keep the spring (F) . Use caution to avoid moving the other cable from its position .
7 . Unscrew the two lock nuts (G) holding the jacket of the other end of the cable to the CPR handle . Remove the
wire from the handle . Once the new cable is installed, the free play of the CPR handle must not be more than 1/8” .
8 . Reverse the above steps to install the new cable .
9 . Test the CPR positioning before returning the bed to service .
Service Information
Summary of Contents for FL28EX
Page 2: ......
Page 83: ...www stryker com 28EX 009 002 REV B 1 81 Return To Table of Contents English Notes ...
Page 99: ...www stryker com 28EX 009 002 REV B 1 97 Return To Table of Contents English Notes ...
Page 162: ......
Page 257: ...www stryker com 28EX 009 002 REV B 2 95 Retour à la table des matières Français Commentaires ...
Page 320: ......
Page 321: ......