Maintenance Manual
30
FOWLER ACTUATOR REPLACEMENT
Required Tools:
Long Nose Pliers
Phillips Screwdriver
Pliers
Side Cutters
Procedure:
1. Raise the bed fully up and apply the brakes. Raise the Knee Gatch fully up.
2. Unplug the bed power cord from the wall outlet.
3. Lower the siderails.
Figure 4.3B
A
B
C
D
E
F
G
H
I
J
K
J
K
M
L
M
N
N
O
O