Transport, Set-up and Connection
4 — 6
04_0134_0802GB
Please also refer to the ”General Technical Description” or the electri-
cal circuit diagram for the electrical connection values.
Refer also to chapter ”General Technical Description” -- section:
”Technical data and rating plate” for more details.
Heavy current
Work on the electrical system and equipment of the machine must
be carried out by a qualified electrician or by instructed persons un-
der the supervision and guidance of a qualified electrician and in
accordance with electrical engineering rules and regulations.
Caution
Do not turn the main switch on at this stage.
The main switch must remain locked until the entire system has been
completely assembled.
Electrical installation prerequisites should be checked by a qualified
electrician before connection work begins.
-- The connected load of the existing electrical installation must be
sufficient for the machine.
-- Please refer to the technical data for the maximum back-up fuse
values.
-- The installation should always be connected to a special feed
point.
-- All phases and the PE (Potential Earth) protective conductor must
be present.
4.7
Electrical connection
Prerequisites