Varan 1.14, 1.20
Changes in models reserved.
Dimensions not binding!
27
7.2 Switching Off
To switch off the boiler, hold P2 (ON/OFF) for 2 to 3 seconds until
a conformation sound is audible. The boiler is now switched off.
Operating Phases
7.1.3 Starting Pellet Load
Activate the pellet dosing system for loading fuel into the combustion plate. This procedure can only be activated if the controller
display shows ‚OFF‘ on the main screen.
- Press P3 (SET);
- The display will read a list. Use the buttons P4 (^) and P6 (v) to select ‚Load‘.
- Confirm the selection with P3 (SET).
- Use P4 (^) resp. P6 (v) to select ‚ON‘ and confirm with P3 (SET).
- After pressing the button, the pellet auger starts running. Let it run until the first pellets fall into the combustion plate (visually
inspect through the inner combustion chamber door.)
- To stop this procedure, select ‚OFF‘ and confirm the selection.
- Press 1 (ESC) to leave the sub menu.
7.1.4 Starting Combustion
Hold P2 (ON/OFF) for 2 to 3 seconds until a conformation sound is
audible. The display will now read ‚Ignition‘. The boiler is now in
operation.
When using standard pellets and if the air-flue-installation has
been carried out correctly, the combustion process starts after 5
to 10 minutes.
When starting up a new
Varan
boiler, there may be an increased
amount of smoke and combustion odour. This occurs because of
coatings which protect the boiler against corrosion. After several
hours of operation, the coating is burned out and stops emitting
odours.