Part No. 408599-0001_REV_A
V650 Flex3D Printing System
Site Preparation Guide
Page 1: ...Part No 408599 0001_REV_A V650 Flex 3D Printing System Site Preparation Guide...
Page 2: ...ner material buyer to determine that Stratasys material is safe lawful and technically suitable for the intended application as well as identify the proper disposal or recycling method consistent with...
Page 3: ...3 Environmental Requirements 7 Electrical Requirements 9 Controller and Workstation Requirements 10 LAN Requirements 10 Receiving the Printer 11 Inspect Crate for Damage 11 Preparing For Installation...
Page 4: ...o not defeat or bypass the ground lead Know the location of equipment branch circuit interrupters or circuit breakers and how to turn them on and off in case of emergency Know the location of fire ext...
Page 5: ...based Phoenix machine control software which is accessed via a user friendly touch screen interface Components The V650 Flex Printer Resin Vat Resin Welcome Kit containing Documentation on how to dow...
Page 6: ...paragraph of instruction to which it relates A Caution indicates a procedure that may cause damage to equipment if the procedure is not followed A Caution will precede the paragraph of instruction to...
Page 7: ...er may be transported The suggested minimum doorway size is 84 inches high x 48 inches wide 213 cm x 122 cm Also consider the need for the unit to be raised onto a fork lift when being moved Figure 1...
Page 8: ...Site Preparation Guide Site Prep Tasks Page 4 Figure 2 V650 Flex Center of Mass The center of mass dimensions shown are taken from the bottom center of the front left foot...
Page 9: ...doors and covers Additional room in the front is recommended to allow for easy positioning of the resin filled vat 27 5 inches wide x 29 5 inches deep x 33 inches high Figure 3 Minimum Space Front Re...
Page 10: ...Minimum Space Top The minimum height requirement of 105 inches 266cm must be met in order to install the V650 Flex printer No installation should proceed without verification of the minimum 105 inches...
Page 11: ...g the site s HVAC system Typical Heat output 210W or 716 BTU per hour Typical heat output is calculated at 50 of typical power consumption 3 5Amps 120V 120 3 5 50 210W 210 3 41 716BTU hr Maximum Heat...
Page 12: ...Site Preparation Guide Site Prep Tasks Page 8 Figure 5 Laser Chamber Figure 6 Air Out Cutout...
Page 13: ...must connect to a US power cord plug provided by customer and must be located within 2 m 80 inches of the printer Operation of the printer outside this range is not recommended degradation of performa...
Page 14: ...jobs an operator simply downloads the build file from network servers onto a V650 Flex printer which becomes available However for this workflow the Operator logging into the V650 Flex must be provid...
Page 15: ...qty 2 with minimum 6 feet height capability and 250 lbs weight capacity Cutting pliers or knife to cut zip ties Shrink wrap Tape for repackaging bubble wrapped components A forklift with 4 foot long...
Page 16: ...te If possible take a picture of these indicators to share with your installation representative If damage is detected upon installation this photo will assist your installation representative in dete...
Page 17: ...ips bit remove the screws 12 that secure the front panel to the crate Figure 9 Remove and set aside the front of the crate to be reassembled packed for storage Figure 9 Shipping Crate Detail Use ladde...
Page 18: ...s to the shipping crate base 4 Slide the remaining left right rear and top crate panels still assembled back until they are free of the shipping crate base Figure 10 Set aside the crate panels to be r...
Page 19: ...ve the two shipping straps 7 Using a utility knife carefully cut away and remove the plastic shrink wrap surrounding the printer Figure 11 Corner Strap Ratchet 8 Use a fork lift to remove the printer...
Page 20: ...orks to 29 inches to fit inside the structural lifting tubes on the printer base Figure 12 Figure 12 Forklift Spread Distance Alternate lifting method If the forks are not wide enough or if the extens...
Page 21: ...ny 6 Remove and unwrap the following bubble wrapped components from the shipping crate base Recoater covers Qty 3 left right and front Light stack 7 Set aside the base to be reassembled packed for sto...
Page 22: ...raining brackets 2 to the shipping crate base Figure 13 Save the brackets and lag screws for re crating 3 Lift the resin vat off of the shipping crate base and carefully lower it to the floor Figure 1...
Page 23: ...C The site s environmental humidity is between 10 to 50 non condensing The site s altitude does not exceed 6561 68 feet 2000 m The minimum floor to ceiling height 105 inches has been met Required Ins...
Page 24: ...THE 3D PRINTING SOLUTIONS COMPANY www stratasys com _____ c support stratasys com...