50 Maintenance
Dimension BST 1200 / SST 1200 User Guide
As Needed Maintenance
The following maintenance items have no routine schedule but
should be tended to as needed.
Remove Debris Buildup
Remove all material buildup on the Z Platform and around the lead
screw (
See “Lead Screw and Guide Rod Identification” on
page 49.
). Failure to do so could cause the base to become unlevel
or the Z Platform to jam at its upper limit.
Vacuum Build Chamber
Vacuum the build chamber to remove all foreign particles and
purged material.
Clean Door Glass
The door glass can be cleaned with any commercial glass cleaner.
Chamber Light Bar
Replace a chamber light bar when it burns out.
NOTE
There are two light bars in the modeling chamber. They are
located on the front wall of the chamber - one to the right, the
other to the left of the chamber door.
Replace chamber light bar:
1. Power down the system.
2.
Locate the wiring harness leading away from the bottom of the
light bar.
3.
Disconnect the light bar from the wiring harness by squeezing
the wiring harness clip while pulling down.
CAUTION
Use only a factory authorized
replacement light bar.