CleanStation CSIIP Site Preparation Guide

DOC-03202 Rev. A

5

2  Shipment and Delivery

2.1  Shipping Information and Responsibility

Stratasys Ltd. will arrange shipment to the customer’s facility, as indicated in the 
“ship to” section of the invoice. It is the customer’s responsibility to provide 
Stratasys with detailed delivery instructions. The customer is also responsible for 
transporting the system to a suitably prepared installation location.

Upon request, customer support engineers will provide advice regarding these 
matters.

Equipment should be unpacked and installed in the presence of authorized 
Stratasys representatives.

2.2  Shipping Size and Weight

The CSIIP is shipped in a shipping box on a wooden pallet. The following table 
provides the approximate size and weight as shipped:

Table 1  CSIIP shipping size and weight

W x H x D (cm)

W x H x D (in)

Weight

109 x 127 x 94

43 x 50 x 37

156.5 kg / 345 lbs

2.3  Lifting Equipment

A forklift or hand pallet truck with the following specifications is required:

•  Lifting capacity of 200 kg (440 lb)
•  90-centimeter (36-inch) extension

2.4  Unloading

It is the customer’s responsibility to determine what type of truck is required to 
deliver the CSIIP, based on whether or not there is a loading dock at the site.

The unloading area should be a level surface.

•  A receiving area of 10 m

2

 (108 sq ft) is required for the forklift to remove the 

CSIIP from the delivery truck.

•  A clearance of 180 cm (6 ft) from all sides of the packaging is required for 

unloading the CSIIP from the pallet.

•  The installation location must be accessible from the unloading area. The 

customer is responsible for unloading the CSIIP from the truck and 
transferring it to the installation location.

Summary of Contents for CLEANSTATION CSIIP

Page 1: ...DOC 03202 Rev A CSIIP SUPPORT REMOVAL SYSTEM SITE PREPARATION CLEANSTATION CSIIP SITE PREPARATION GUIDE ON GUIDE ...

Page 2: ...o part of this document may be reproduced in any form or by any means nor stored in a database or retrieval system without prior permission in writing from Stratasys Ltd If this document is distributed as a PDF file you may print it for internal use Dec 2015 DOC 03202 Rev A Trademarks All names of products and services cited in this book are trademarks or registered trademarks of their respective ...

Page 3: ...ng Equipment 5 2 4 Unloading 5 3 Physical Description 6 3 1 Size and Weight 6 3 2 Tank Capacity 6 4 Site Requirements 7 4 1 Positioning Clearance 7 4 2 Water and Drain Connections 7 4 3 Floor 7 4 4 Power 8 4 5 Grounding 8 4 6 Residual Current Device RCD 8 4 7 Electrical Connection 8 5 Environmental Requirements 9 5 1 Temperature and Humidity 9 5 2 Ventilation 9 6 Checklist 10 6 1 Customer Informat...

Page 4: ...factured by PM Technologies The customer is responsible for preparing the site as described in this document If you have any questions about the information in this document contact your Stratasys representative All site requirements must be met before the installation date The Site Preparation Checklist should be sent to your Stratasys representative Shipping will be arranged after the signed che...

Page 5: ...approximate size and weight as shipped Table 1 CSIIP shipping size and weight W x H x D cm W x H x D in Weight 109 x 127 x 94 43 x 50 x 37 156 5 kg 345 lbs 2 3 Lifting Equipment A forklift or hand pallet truck with the following specifications is required Lifting capacity of 200 kg 440 lb 90 centimeter 36 inch extension 2 4 Unloading It is the customer s responsibility to determine what type of tr...

Page 6: ...Weight The following table shows the size and weight of CSIIP Table 2 CSIIP Size and Weight W x H x D cm W x H x D in Weight empty Outside dimensions 92 x 102 x 75 36 2 x 40 2 x 29 5 143 kg 315 lbs Inside tank dimensions 41 x 45 7 x 36 16 2 x 18 x 14 2 3 2 Tank Capacity The liquid capacity of CSIIP is 60 liters 15 8 gallons ...

Page 7: ...connecting to a water supply tap It is the customer s responsibility to ensure that there is a water tap near the CSIIP installation location The waste water solution from the unit should empty into the building s drainage system The customer must prepare a suitable drain near the unit It is recommended that you locate the drain pipe behind the CSIIP Dispose of the waste water solution according t...

Page 8: ...r in the electrical wall outlet is properly grounded in accordance with your local electrical codes 4 6 Residual Current Device RCD The customer must verify that the electrical outlet for the CSIIP is connected to a residual current device RCD also known as a ground current leakage detector that protects the circuit from a current leakage of more than 30 mA 4 7 Electrical Connection The CSIIP is s...

Page 9: ...control system in the room should ensure that the room temperature and relative humidity do not exceed the limits listed in the table below Table 4 Room temperature and relative humidity Range Temperature 18 C 25 C 64 F 77 F Relative humidity 30 70 non condensing optimal 55 If the room temperature and humidity are outside of the specifications provided above the Support removal process might be pr...

Page 10: ...ys service personnel are sent to your site 6 1 Customer Information Company Name ______________________________________________ Address ____________________________________________________ __________________________________________________________ Phone No ____________________ Fax No _______________________ E mail ____________________________________________________ 6 2 Checklist Item Completed as...

Page 11: ...Connex1 Objet260 Connex2 Objet260 Connex3 Objet350 Connex1 Objet350 Connex2 Objet350 Connex3 Objet500 Connex1 Objet500 Connex2 Objet500 Connex3 Durus Endur Vero VeroBlue VeroBlackPlus Ver oClear VeroCyan VeroDent VeroDentPlus VeroGlaze VeroGray VeroMagenta VeroWhitePlus VeroYellow Tango TangoBlack TangoBlackPlus TangoGray TangoPlus Digital ABS and Digital ABS2 are trademarks or registered trademar...

Reviews: