CleanStation CSIIP Site Preparation Guide
DOC-03202 Rev. A
3
Contents
1.1 About this Guide
2.1 Shipping Information and Responsibility
2.4 Unloading
3.1 Size and Weight
3.2 Tank Capacity
4.2 Water and Drain Connections
4.3 Floor
4.4 Power
4.5 Grounding
4.6 Residual Current Device (RCD)
5.2 Ventilation
6.2 Checklist