CleanStation CSIIP Site Preparation Guide
DOC-03202 Rev. A
10
6 Checklist
Dear customer,
After preparing your site for the installation of the CleanStation CSIIP Site
Preparation Guide, please complete the customer information and the checklist
below, and fax it to your Stratasys representative.
Consult with your representative if you have any questions related to site
preparation and the checklist.
This form must be received and approved before installation and training are
scheduled, and before Stratasys service personnel are sent to your site.
6.1 Customer Information
Company Name: ______________________________________________
Address: ____________________________________________________
__________________________________________________________
Phone No.: ____________________ Fax No.: _______________________
E
‐
mail: ____________________________________________________
6.2 Checklist
Item
Completed as
Required?
Yes
No
Notes
Positioning (Section 4.1 )
o
o
Water and Drain (Section 4.2 )
o
o
Floor (Section 4.3 )
o
o
Power (Section 4.4 )
o
o
Grounding (Section 4.5 )
o
o
Residual Current Device
(RCD) (Section 4.6 )
o
o
Electrical Connector and
Connection (Section 4.7 )
o
o
Temperature (Section 5.1 )
o
o
Ventilation (Section 5.2 )
o
o