background image

[email protected]

STRATASYS.COM

___

HEADQUARTERS
7665 Commerce Way, Eden Prairie, MN 55344
+1 888 480 3548 (US Toll Free)
+1 952 937 3000 (Intl)
+1 952 937 0070 (Fax)

2 Holtzman St., Science Park, PO Box 3496
Rehovot 76124, Israel
+972 74 745 4000
+972 74 745 5000 (Fax)

THE

3D PRINTING SOLUTIONS

COMPANY

ISO 9001:2008 Certified
©(Undefined variable: variablesmaster.Year) Stratasys Inc. All rights reserved. Stratasys, Stratasys logo, PolyJet, Objet, Objet24, Objet30, Objet30 Pro, Objet30
Prime, Eden, Objet Eden260V, Objet Eden260VS, Objet Eden350V, Objet Eden500V, Connex, Objet260 Connex1, Objet260 Connex2, Objet260 Connex3, Objet350
Connex1, Objet350 Connex2, Objet350 Connex3, Objet500 Connex1, Objet500 Connex2, Objet500 Connex3, Durus, Endur, Vero, VeroBlue, VeroBlackPlus, Ver-
oClear, VeroCyan, VeroDent, VeroDentPlus, VeroGlaze, VeroGray, VeroMagenta, VeroWhitePlus, VeroYellow, Tango, TangoBlack, TangoBlackPlus, TangoGray,
TangoPlus, Digital ABS and Digital ABS2 are trademarks or registered trademarks of Stratasys Inc., registered in the United States and other countries. ULTEM is a
registered trademark of SABIC or affiliates. All other trademarks belong to their respective owners. Product specifications subject to change without notice. For more
information about Stratasys systems, materials and applications, call 888.480.3548 or visit www.stratasys.com

 

Summary of Contents for CLEANSTATION CSIIP

Page 1: ...DOC 03202 Rev A CSIIP SUPPORT REMOVAL SYSTEM SITE PREPARATION CLEANSTATION CSIIP SITE PREPARATION GUIDE ON GUIDE ...

Page 2: ...o part of this document may be reproduced in any form or by any means nor stored in a database or retrieval system without prior permission in writing from Stratasys Ltd If this document is distributed as a PDF file you may print it for internal use Dec 2015 DOC 03202 Rev A Trademarks All names of products and services cited in this book are trademarks or registered trademarks of their respective ...

Page 3: ...ng Equipment 5 2 4 Unloading 5 3 Physical Description 6 3 1 Size and Weight 6 3 2 Tank Capacity 6 4 Site Requirements 7 4 1 Positioning Clearance 7 4 2 Water and Drain Connections 7 4 3 Floor 7 4 4 Power 8 4 5 Grounding 8 4 6 Residual Current Device RCD 8 4 7 Electrical Connection 8 5 Environmental Requirements 9 5 1 Temperature and Humidity 9 5 2 Ventilation 9 6 Checklist 10 6 1 Customer Informat...

Page 4: ...factured by PM Technologies The customer is responsible for preparing the site as described in this document If you have any questions about the information in this document contact your Stratasys representative All site requirements must be met before the installation date The Site Preparation Checklist should be sent to your Stratasys representative Shipping will be arranged after the signed che...

Page 5: ...approximate size and weight as shipped Table 1 CSIIP shipping size and weight W x H x D cm W x H x D in Weight 109 x 127 x 94 43 x 50 x 37 156 5 kg 345 lbs 2 3 Lifting Equipment A forklift or hand pallet truck with the following specifications is required Lifting capacity of 200 kg 440 lb 90 centimeter 36 inch extension 2 4 Unloading It is the customer s responsibility to determine what type of tr...

Page 6: ...Weight The following table shows the size and weight of CSIIP Table 2 CSIIP Size and Weight W x H x D cm W x H x D in Weight empty Outside dimensions 92 x 102 x 75 36 2 x 40 2 x 29 5 143 kg 315 lbs Inside tank dimensions 41 x 45 7 x 36 16 2 x 18 x 14 2 3 2 Tank Capacity The liquid capacity of CSIIP is 60 liters 15 8 gallons ...

Page 7: ...connecting to a water supply tap It is the customer s responsibility to ensure that there is a water tap near the CSIIP installation location The waste water solution from the unit should empty into the building s drainage system The customer must prepare a suitable drain near the unit It is recommended that you locate the drain pipe behind the CSIIP Dispose of the waste water solution according t...

Page 8: ...r in the electrical wall outlet is properly grounded in accordance with your local electrical codes 4 6 Residual Current Device RCD The customer must verify that the electrical outlet for the CSIIP is connected to a residual current device RCD also known as a ground current leakage detector that protects the circuit from a current leakage of more than 30 mA 4 7 Electrical Connection The CSIIP is s...

Page 9: ...control system in the room should ensure that the room temperature and relative humidity do not exceed the limits listed in the table below Table 4 Room temperature and relative humidity Range Temperature 18 C 25 C 64 F 77 F Relative humidity 30 70 non condensing optimal 55 If the room temperature and humidity are outside of the specifications provided above the Support removal process might be pr...

Page 10: ...ys service personnel are sent to your site 6 1 Customer Information Company Name ______________________________________________ Address ____________________________________________________ __________________________________________________________ Phone No ____________________ Fax No _______________________ E mail ____________________________________________________ 6 2 Checklist Item Completed as...

Page 11: ...Connex1 Objet260 Connex2 Objet260 Connex3 Objet350 Connex1 Objet350 Connex2 Objet350 Connex3 Objet500 Connex1 Objet500 Connex2 Objet500 Connex3 Durus Endur Vero VeroBlue VeroBlackPlus Ver oClear VeroCyan VeroDent VeroDentPlus VeroGlaze VeroGray VeroMagenta VeroWhitePlus VeroYellow Tango TangoBlack TangoBlackPlus TangoGray TangoPlus Digital ABS and Digital ABS2 are trademarks or registered trademar...

Reviews: