76
FP10 Lafayette - Installation and Operation Manual
Secure the telescoping sections (A) to the heat distribution box (C) with self-tapping screws (B) (3 per
telescoping section). Determine the needed height and secure the two parts of the telescoping sections
together with 3 self-tapping screws provided. Insert the adjustable frame (D) in the heat distribution box
(C), press it against the non-combustible finishing material and secure with 4 screws into the heat
distribution box. Set the decorative plate (E) to the adjustable frame (D).
Summary of Contents for Valcourt FP10 Lafayette
Page 10: ...10 FP10 Lafayette Installation and Operation Manual...
Page 11: ...FP10 Lafayette Installation and Operation Manual 11...
Page 12: ...12 FP10 Lafayette Installation and Operation Manual...
Page 38: ...38 FP10 Lafayette Installation and Operation Manual...
Page 92: ...92 FP10 Lafayette Installation and Operation Manual APPENDIX 7 EXPLODED DIAGRAM AND PARTS LIST...