64
FP10 Lafayette - Installation and Operation Manual
8.8.2
Universal Offset Support
This support is used to support the chimney above an offset. When the chimney offset is used to pass
through a wall, this support may be used on the wall to support the chimney. For offset support installation,
refer to the instructions provided with the support by the chimney manufacturer. Many manufacturers will
provide the maximum height of chimney that can be supported by the support. Make sure you respect
those parameters.
8.9
Installation Instructions for Masonry Application
WARNING:
BEFORE STARTING THE INSTALLATION, THE MASONRY CHIMNEY MUST BE INSPECTED BY A
QUALIFIED SWEEP.
The following requirements must be respected:
1.
The chimney must be absolutely clear of any soot residue or creosote. Check for cracks, loose or missing
bricks that could inhibit correct installation of the liner.
2.
The clearance to combustible must be a minimum of 1" between the outside of the masonry and any
wood framing or loose insulation.
3.
The chimney must be built in accordance with the current building code.
4.
No other appliance can be connected to the same chimney.
Installation:
The chimney must be relined with a stainless steel liner of the same diameter as the outlet of the
fireplace. For connection at 30
°
or 45° angle, a special connector (B) must be used to connect the liner (C)
to the insulated chimney (A). Verify availability and installation instructions for this connector with the
chimney manufacturer.
Summary of Contents for Valcourt FP10 Lafayette
Page 10: ...10 FP10 Lafayette Installation and Operation Manual...
Page 11: ...FP10 Lafayette Installation and Operation Manual 11...
Page 12: ...12 FP10 Lafayette Installation and Operation Manual...
Page 38: ...38 FP10 Lafayette Installation and Operation Manual...
Page 92: ...92 FP10 Lafayette Installation and Operation Manual APPENDIX 7 EXPLODED DIAGRAM AND PARTS LIST...