4
866-795-1586 • WWW.STONEAGETOOLS.COM
SUB-ASSEMBLY COLOR CODE DIAGRAM
REVIEW THIS BEFORE STARTING ASSEMBLY:
THE FIVE COLOR CODED SUB-ASSEMBLIES NEED TO BE ASSEMBLED BEFORE
CONNECTING EVERYTHING TO THE DOMED BUNDLE. THE COLORS ARE ASSOCIATED TO
THEIR RESPECTIVE SECTIONS IN THIS MANUAL. THE HOSE CONNECTIONS WILL BE MADE
IN A LATER SECTIONS OF THIS MANUAL
SUB-ASSEMBLY 3
(RAIL MOUNT, SNOUT, AND TOOL)
SUB-ASSEMBLY 2
(LINEAR DRIVE HANDLE)
SUB-ASSEMBLY 1
(ABX-PRO, ROLLERS, COLLET
BLOCK, GUIDE TUBE)
*
INDIVIDUAL COMPONENTS
TO BE INSTALLED LATER IN
THE MAIN INSTALLATION
SUB-ASSEMBLY 5
(OPTIONAL DUMP
SYSTEM SET-UP)
SUB-ASSEMBLY 4
(CONTROL BOX AND CAMERA)
*
Spider
Mount
*
Rotary
Drive
*
Rotary Drive
Rail
Summary of Contents for PROPOSITIONER PROP-DBP
Page 1: ...PL 688 REV D 08 2020 PROPOSITIONER PROP DBP ACCESSORY USER MANUAL...
Page 7: ...7 866 795 1586 WWW STONEAGETOOLS COM NOTES PAGE LEFT BLANK INTENTIONALLY...
Page 51: ...51 866 795 1586 WWW STONEAGETOOLS COM PAGE LEFT BLANK INTENTIONALLY NOTES...
Page 52: ...52 866 795 1586 WWW STONEAGETOOLS COM PAGE LEFT BLANK INTENTIONALLY NOTES...
Page 53: ...53 866 795 1586 WWW STONEAGETOOLS COM PAGE LEFT BLANK INTENTIONALLY NOTES...
Page 56: ...1 866 795 1586 www STONEAGETOOLS com 2020 StoneAge Inc All Rights Reserved...