Doc653/30CV02A

 

27

-  Setting the CO

2

 value for the R30 series 

There is a fl at setting screw on the venturi with which the CO

2

 value can be set at full load. Set 

the boiler at full load and check the CO

2

 value. 

If necessary, adjust with the fl at setting screw: clockwise gives less CO

2

, anti-clockwise gives 

more CO

2

.

There is a torcx setting screw on the gas valve with which the CO

2

 value can be set at minimum 

load. Set the boiler at minimum load and check the CO

2

 value. If necessary, readjust with the 

torcx setting screw: clockwise gives less CO

2

, anti-clockwise gives more CO

2

. After the CO

2

 

values have been set, they should be checked once again and corrected if necessary. 

-  Conversion from natural gas to propane.

For the types R30/45, R30/65, R30/85 and R30/100, a throttle ring will be required for pro-
pane. This should be installed between the gas valve and venturi. After the conversion, the CO

2

 

values should be set at full load and minimum load.
For the type R30/120 it’s only necessary to change the gas volume on the gas valve by using 
the setting screws.

Type

Diameter of throttle ring

R30/45

6.8 mm

R30/65

6.0 mm

R30/85

6.0 mm

R30/100

6.8 mm

-  Remove the measuring equipment and re-fi t the case
-  The boiler is now ready for operation

  8 Maintenance

 

8.1 Safety

Wear suitable clothing and shoes for maintenance work. Before you wear jewellery and loose 
clothing, think of your safety.

 

8.2 General

In order to ensure the proper and safe working of the boiler for a long period of time, it should be 
inspected at least once a year.

The following operations should be carried out (for a more extensive description of these opera-
tions, see 8.3):
-  Replace the ignition and ionisation electrodes
-  Clean the fan impeller
-  Clean the boiler condensate bottle trap and the drain pipe
-  Clean the gas fi lter (if there is one)
-   After removing the casing, you can look at the front side with a sight glass at the ignition and 

combustion (fl ame picture)

-   Test the boiler combustion for CO

2

 and CO and if necessary correct the same at minimum load 

and at full load

-  Measure the water temperature difference ∆t as a measure of the fl ow rate
-  Check the water pressure
-  Inspect the water quality: hardness and chloride contents 
-  Clean the casing on the outside and ensure that it looks clean again

Summary of Contents for ECONOFLAME R30

Page 1: ...ILERS INSTALLATION OPERATION MAINTENANCE DOCUMENTATION STOKVIS ENERGY SYSTEMS 96R WALTON ROAD EAST MOLESEY SURREY KT8 0DL TEL 08707 707 747 FAX 08707 707 767 E MAIL info stokvisboilers com WEBSITE www...

Page 2: ...r manner whatsoever without the prior permission of Rendamax B V in writing We are engaged in a constant effort to improve our products As a result of this process the products may deviate slightly fr...

Page 3: ...ea 5 2 1 General 5 2 2 Installation 5 2 3 Ventilation 11 5 3 Connections 5 3 1 Gas connection 5 3 2 Electrical connections 5 3 3 Water connections 14 5 3 4 Flue gas outlet and air inlet 5 3 4 1 Connec...

Page 4: ...23 6 5 Setting into operation 25 6 6 Switching off the appliance 6 7 Warnings 7 Commissioning 7 1 General 7 2 Commissioning 26 8 Maintenance 27 8 1 Safety 8 2 General 8 3 Procedure 28 8 4 Cleaning the...

Page 5: ...6 17 20 30 50 Maximum water temperature of central heating system Maximum operating pressure Water content Water resistance T 20 C Excess head of the boiler pump T 20 C C bar litre kPa kPa 90 6 5 1 1...

Page 6: ...00 G R 3 4 R 3 4 R 3 4 R 3 4 R 3 4 L mm 340 405 510 560 670 L1 mm 74 90 90 90 90 W R 11 4 Rp 1 R 11 4 Rp 1 R 11 4 Rp 1 R 11 4 Rp 1 R 11 4 Rp 1 Table 2 Dimensions of the R30 We reserve the right to mak...

Page 7: ...of this documentation You can of course always obtain further information via www stokvisboilers com 1 3 This document The present documentation has been prepared with the following target groups in...

Page 8: ...the boiler is delivered fully wired fully assembled and tested Working principle and design Air is drawn in as required via a speed controlled fan The zero pressure controller of the gas valve measur...

Page 9: ...heating systems with constant ow temperature weather dependent set point adjustment low temperature condensing system external temperature control via building optimiser 0 5 Vdc 10 C 90 C below 1Vdc t...

Page 10: ...ler 11 Automatic boiler controller 21 Control panel 2 2 1 Description of principal components The boiler is made of the following components Fan 9 The fan pulls in and compresses the combustion air dr...

Page 11: ...epending on the load Condensate drain 13 The boiler is equipped with a bottle trap This bottle trap is located on the bottom side of the ap pliance and can be easily lled with water Frame 14 The frame...

Page 12: ...nised installer in accordance with applicable na tional and local standards and speci cations The installation should only be used for heating systems with a maximum water temperature of 90 C It is ex...

Page 13: ...r covered up and should be maintained in a legible condition throughout the life of the appliance Immediately replace damaged or illegible instruction and warning stickers Modi cation The appliance ma...

Page 14: ...ng the winter are in danger of freezing Drain out the water from the lling and drain valve 5 Installation 5 1 Regulations The appliance should be installed by a recognised installer in accordance with...

Page 15: ...3 1 Gas connection The gas connection should be installed by a recognised installer in accordance with applicable national and local standards and speci cations The gas connection is located on the b...

Page 16: ...es according to the EMC Directives Controls and options The boilers are equipped with a modulating control system The temperature can be controlled via a 0 5 Vdc signal for example in response to exte...

Page 17: ...olled hot water re circulation pump Pump kick function DCF receiver for internal clock optional receiver required Communication over a CAN bus Integrated relay and sensor test Can be used in stand alo...

Page 18: ...the ow and return pipes are securely xed with brackets This prevents damage and makes maintenance easier The boiler is an instantaneous boiler and is not suitable for use in open vented systems In suc...

Page 19: ...connection for the air supply is on the top of the boiler The air supply pipe should be airtight This is to prevent the suction of false air Horizontal com ponents in the air supply should be installe...

Page 20: ...is equipped with a premix burner with a fan an overpressure is created in the boiler This overpressure is suf cient to overcome the resistance of the burner the heat exchang er and the chimney The ba...

Page 21: ...Diameter in mm Pipe bend 90 R D 0 5 Pipe bend 90 R D 1 Pipe bend 45 R D 0 5 T piece R30 45 70 80 3 5 4 0 1 4 1 5 1 1 1 2 4 0 4 0 R30 65 80 90 100 4 0 4 5 4 9 1 5 1 7 1 8 1 2 1 3 1 4 4 0 4 5 5 4 R30 8...

Page 22: ...tion should not be adverse ly affected by the use of valves non return valves systems in which several boilers are connected to a common distribution pipe etc The maximum water ow is achieved at t 15...

Page 23: ...1 0 0 5 0 2 Rp 1 Rp 11 4 0 0 5 10 lgpm 0 0 5 1 1 5 2 l s 1 2 3 4 5 6 m3 h m s v 15 20 3 1 5 Wilo TOP S 25 7 Wilo TOP S 30 7 1 230 V Rp 1 Rp 11 4 2 2 2 Q H m Fig 5 Pump characteristics 5 4 1 3 Shut off...

Page 24: ...ordance with the kW rating and system pressure 5 4 3 Water temperature The maximum permissible water ow temperature is 90 C If the limit thermostat is triggered at 97 C the boiler will switch off and...

Page 25: ...in the return line of the secondary part of the system In order to guarantee a properly working system and long life one should remove suspended and corrosive particles by installing a suitable lter s...

Page 26: ...ion at minimum 6 Output status burner load P17 7 Actual required parameter value W2 Service operation at maximum 8 Error code parameter number burner load P9 9 Status inputs Desired load required by t...

Page 27: ...t The new ow temperature will now be active Close the lid Set the required hot water temperature for hot water operation This is only applicable if the hot water mode is being used Open the lid Turn t...

Page 28: ...upted The resistance value measured by the ue temperature sensor lies outside the range of 10 and 126 C Repair the fault and press reset An external safety device connected to the terminals 1 3 has be...

Page 29: ...tion to t B The boiler is out of operation and only comes into operation due to the automatic frost protec tion system Using the rotary selector switch set the type of operation to K C Switch off the...

Page 30: ...lue for full load Reference value for CO2 Types R30 45 R30 65 R30 85 and R30 120 8 8 0 2 for natural gas G20 G25 9 8 0 2 for propane G31 Type R30 100 9 4 0 2 for natural gas G20 G25 10 4 0 2 for propa...

Page 31: ...by using the setting screws Type Diameter of throttle ring R30 45 6 8 mm R30 65 6 0 mm R30 85 6 0 mm R30 100 6 8 mm Remove the measuring equipment and re t the case The boiler is now ready for operat...

Page 32: ...ges Check the combustion Calibrated measuring equipment should be used to carry out gas air and ue gas measurements 8 4 Cleaning the burner and the heat exchanger The burner can be cleaned on both sid...

Page 33: ...7 1 0914 CO easured 2 Conversion factors For NOx N 1 1 ppm 2 05 mg m3 1 759 mg kWh 0 498 mg MJ For CO N 1 1 ppm 1 24 mg m3 1 064 mg kWh 0 298 mg MJ Example Measured values for an environmentally frie...

Page 34: ...oss calori c value o Fuel ef ciency at the nett calori c value CO2 The volume of CO2 in the ue gas O2 The volume of O2 in the ue gas A The quantity of condensed water in the appliance per m3 gas in kg...

Page 35: ...Doc653 30CV02A 31...

Page 36: ...32 Doc653 30CV02A...

Reviews: