INSTALLATION
preparation
24
| LWE 40
www.stiebel-eltron.com
4.3 Wall construction
The space between the wall and the wall mount casing must be
sealed on the inside and outside so that it is airtight.
Solid masonry with composite thermal insulation (plan view)
~10
175-240
120-160
~10
D
00000
700
46
1
2
3
4
5
1 Exterior render
2 Composite thermal insulation
3 Stone
4 Interior plaster
5 2-component PUR foam
Masonry with timber frame construction (plan view)
11,5
18-28
60-80
180-240
40-60
185 x 185
1
2
3
4
5
7
8
6
D
00000
700
47
1 Soft fibreboard
2 Load bearing element
3 Timber frame construction with insulation in between
4 OSB board
5 Installation level (wooden structure with insulation in
between)
6 Plasterboard
7 Wooden edging
8 2-component PUR foam
Masonry with clinker construction (plan view)
~10
115
30-50
175-240
80-120
D
00000
700
48
1
2
3
4
5
6
1 Clinker brick
2 Air gap
3 Composite thermal insulation
4 Stone
5 Interior plaster
6 2-component PUR foam
4.4 Wall outlet
The figures show the wall without plaster.
4.4.1 Solid wall
200
DN 2
00
-
300
D
00000
700
59
f
f
Create a wall outlet vertical to the wall without a fall.