Fuselage Construction Cont.
☐
Assemble parts FSa and FSb to create two
“FS” Fuselage Side parts.
Note:
Leave window insert in place at this
time to support window frame during
construction.
☐
Bond FD Fuselage Doubler to FS Fuselage
Side with slow setting thick CA glue. Tabs on
fuselage crutch, which extend through FD, will
engage fuselage sides.
Note: Use 3/16 in.
and 1/8 in. drill bits in wing mount hole and
landing gear lug hole to help with alignment.
☐
Dry fit F1a to F1 and FS
(do not glue)
.
☐
Dry fit F1b to F1a and FS
(do not glue)
.
☐
Fit F5 to F1b and FS. Square assembly on a
flat surface then bond all parts where they
contact the FS and each other.
SkyBuggy © 2010 Stevens AeroModel all rights reserved.
Page 10 of 30
FSa
FSb
F1
F1a
F1b
F5
Alignment Hole
Alignment Hole
FS
FS
F1a
F1b
FS
FS
FD