
4
PRE–INsTallaTION INFORMaTION
check contents
separate all parts from packaging and check each part with the Pack contents
section.
make sure all parts are accounted for before discarding any packaging material. If
any parts are missing, do not attempt to install your touch faucet until you obtain
the missing parts.
Preparation for Installation:
Flush water supply lines thoroughly before installing the faucet. do not allow dirt,
teflon tape or metal particles to enter the faucet.
shut off water supply.
Important:
all plumbing is to be installed in accordance with applicable codes and
regulations.
Faucet InstallatIon
Step 1 – Remove all mounting hardware
1. shut off the water supply and remove the hexagonal
nut, the disk and the gasket. do not remove the o-ring
from the base of the faucet.
Step 2 – Installing the faucet
1. Place the faucet with o-ring into the hole in deck or
lavatory. make sure the o-ring is located between the
deck or lavatory and the bottom of the faucet.
2. slide the gasket over the flexible hose.
3. secure the faucet to deck or lavatory with the
hexagonal nut and the disk.