background image

ii

122990-608

Uncrating/Installation Instructions

Introduction and  Table  of Contents

staff of well equipped, factory-trained technicians to provide this
service, as well as expert repair services. Please contact your
STERIS representative for details.

Sales and Service Information:

Technical Assistance:

STERIS Corporation

STERIS Engineering

5960 Heisley Road

Services

Mentor, Ohio 44060

2424 West 23rd Street

Tel.: 440 354 2600

Erie, PA 16506

Fax : 440 639 8199

Tel.: 814 452 3100
Fax: 814 870 8400

Manufacturing Plant:
STERIS Canada Corporation
415, rue des Alleghanys
Beauport (Quebec)
Canada G1C 4N4
Tel.:   418 664 1549
Fax: 418 664 0188

Web Site: www.steris.com

Summary of Contents for Reliance 1024

Page 1: ...UNCRATING INSTALLATION INSTRUCTIONS Reliance 1024 1034 Laboratory Glassware Dryers 10 18 01 P 122990 608 Rev 4 ...

Page 2: ...TERIS AGREES TO DEFEND INDEMNIFY AND HOLD CUSTOMER HARMLESS FROM ANY AND ALL CLAIMS LIABILITY DAMAGES OR EXPENSES DUE TO PERSONAL INJURIES INCLUDING DEATH TO EMPLOYEES OF STERIS AND CUSTOMER AND TO THIRD PARTIES AND FOR PROPERTY DAMAGE TO THE EXTENT CAUSED BY THE WILLFUL ACTS NEGLI GENCE OR STRICT LIABILITY OF STERIS CUSTOMER AGREES TO DEFEND INDEMNIFY AND HOLD STERIS HARMLESS FROM ANY AND ALL CLA...

Page 3: ...ended processing technique Any alteration of this equipment not authorized or performed by STERIS Engineering Service which could affect its operation will void the warranty could adversely affect sterilization efficacy could violate federal state and local regulations and jeopardize your insurance coverage A thorough preventive maintenance program is essential to safe and proper unit operation Th...

Page 4: ...representative for details Sales and Service Information Technical Assistance STERIS Corporation STERIS Engineering 5960 Heisley Road Services Mentor Ohio 44060 2424 West 23rd Street Tel 440 354 2600 Erie PA 16506 Fax 440 639 8199 Tel 814 452 3100 Fax 814 870 8400 Manufacturing Plant STERIS Canada Corporation 415 rue des Alleghanys Beauport Quebec Canada G1C 4N4 Tel 418 664 1549 Fax 418 664 0188 W...

Page 5: ... PAGE TABLE OF CONTENTS 1 LISTING OF WARNINGS CAUTIONS AND SYMBOLS 1 1 2 UNCRATING INSTRUCTIONS 2 1 Open Crate 2 1 Move Dryer and Remove Skid 2 1 Prepare Dryer for Installation 2 3 3 INSTALLATION INSTRUCTIONS 3 1 Before Installing Equipment 3 1 Connect Utilities 3 1 Cleanup 3 2 4 OPERATIONAL TEST 4 1 ...

Page 6: ... bands used to secure this carton can cause personal injury when cut and tension is released WARNING LACERATION HAZARD When removing bolts or nails wear gloves to protect your hands WARNING BURN HAZARD When blowing out utility supply lines wear gloves face shield and protective clothing CAUTION POSSIBLE EQUIPMENT DAMAGE When removing adhesives from stainless steel use a solvent specially formulate...

Page 7: ...d Symbols Tip N Tell Indicator Attention Consult Manual for Further Instructions This Way Up Do Not Stack Fragile Keep Dry A Amperage Rating of the Unit V Voltage Rating of the Unit Alternating Current kW Power Rating of the Unit Hz Frequency of the Unit f Phase of the Unit Symbols ...

Page 8: ...ide dryer service compartment see Figure 2 2 Tip indicator contains a blue compound at the bottomoftheindicator Ifunithasbeentipped residuefromthe blue compound will be found higher up in the indicator If unit was tipped notify STERIS regional office A service technician will review the equipment and determine if unit was damaged 7 Remove and discard Styrofoam block and skid from under dryer 2 123...

Page 9: ...ncrating InstallationInstructions Uncrating Instructions Top Bands Cardboard Nails Figure 2 1 Crate Figure 2 2 Check Tip Indicator Electrical Box Identification Nameplate Blower Tip Indicator Thermostat Ref 920 001 974 ...

Page 10: ...ve and unwrap shelves guide tabs and Operator Manual 6 Make sure operator receives Operator Manual 7 Insert guide tabs into shelf support strips in chamber see Figure 2 4 8 Place shelves on guide tabs 9 Close chamber door s 10 Remove all packing and tape from control panel 11 Discard all packing material removed during uncrating proce dures Prepare Dryer for Installation 12345678901234567890123456...

Page 11: ...2 4 122990 608 Uncrating InstallationInstructions Uncrating Instructions Figure 2 4 Drying Chamber Adjustable Shelves Chamber Bottom Plate Guide Tab Non adjustable Shelf Shelf Support Strip ...

Page 12: ...nt Drawing or Identification Plate lo cated inside dryer service compartment see Figure 2 2 for proper voltage 2 Place dryer as shown on Equipment Drawing in correct relation to building supply line If unit is not at installation site refer to Uncrating Instructions Section 2 for proper moving instructions NOTE Floorunderunitshouldbelevel Ifnecessary addshims not by STERIS to level unit 1 ELECTRIC...

Page 13: ... operate the equipment RefertoOperatorManual P 122990 607 foroperating procedures 12345678901234567890123456789012123456 12345678901234567890123456789012123456 12345678901234567890123456789012123456 12345678901234567890123456789012123456 12345678901234567890123456789012123456 Cleanup CAUTION When removing adhe sives from stainless steel use a solventspeciallyformulatedforthat purpose Rub in a back...

Page 14: ...ors are installed 4 Close door and press START pushbutton see Figure 4 1 5 Check that In Use indicator light comes on 6 VerifybloweroperatesassoonasSTARTpushbuttonispressed 7 Press STOP pushbutton Check that In Use indicator light goes off 8 Open door s and allow unit to cool DRYER IS NOW READY FOR NORMAL OPERATION 4 Figure 4 1 Control Panel STOP Pushbutton Optional Digital Cycle Timer Optional Te...

Reviews: