4-1
122990-608
Uncrating/Installation Instructions
Operational Test
OPERATIONAL TEST
1.
Open chamber door(s).
2.
Check that drying chamber is empty and all packing material
has been removed.
3.
If unit is equipped with manifold drying option, verify that
manifold connectors are installed.
4.
Close door and press START pushbutton (see Figure 4-1).
5.
Check that In Use indicator light comes on.
6.
Verify blower operates as soon as START pushbutton is pressed.
7.
Press STOP pushbutton. Check that In Use indicator light
goes off.
8.
Open door(s) and allow unit to cool.
DRYER IS NOW READY FOR NORMAL OPERATION.
4
Figure 4-1. Control Panel
STOP Pushbutton
Optional Digital Cycle Timer
Optional Temperature
START
Pushbutton
IN USE Indicator
Light
Ref.: 920-011-834