It  is  important  to  provide  one  Earthing 

sleeve for each pump existing on the filtration 
system. 
 
Place an earthing rod in a location that retains 
humidity (in a watered rock, at the bottom of 
a tree, etc.). 

Connecting the Earth to the Earth 

of the house is prohibited for safety reasons. 

 

This  installation  of  the  Earthing  sleeve 

constitutes the earthing of the pool water and 
not the earthing of the equipment. 
 

 

You  must  connect  the  Earthing  sleeve  to 

the Earthing rod using an Earthing braid with a 
section of at least 20 mm2. 
 
 

 
 
 
 
 
 
 
 

 
 
 

 

 

 
 

7. UPKEEP INSTRUCTIONS 

If  the  recommendations  regarding  the 

installation  conditions  have  been  respected, 
the upkeep of the device should be limited. 

Cut  off  the  power  supply  before  any 

intervention. 

 
However,  periodic  cleaning  of  the 

equipment  with  a  dry  cloth  is  recommended 
(do  not  use  aggressive  chemicals  that  could 
damage  the  equipment,  particularly  on  the 
transparent part of the front face). 

As  with  all  electrical  equipment,  a  certain 

number of periodic checks must be carried out 
(every quarter):  

 

check of the electrical connections 

 

check of the conditions of the cables 
 

8. STORAGE – TRANSPORT 

Your  device  must  be  stored  and 

transported  in  its  original  packaging  in  order 
to protect it from any damage. 

The  package  must  be  stored  in  a  dry 

environment, free of dust and protected from 
any chemical compounds. 
 
Ambient conditions for transport and storage: 

 

Temperature: -10 °C to 40 °C 

 

Air 

humidity: 

Below 

60% 

without 

condensation 
 
 
 

PUMP

 

 

 

 

20 mm cable earth  

minimum towards separate 

earthing rod 

Main drain 

Skimmer 

Brush socket 

Swimming pool 

backflow 

Towards drains 

Filter 

Assembling an earth 

Summary of Contents for Sel

Page 1: ...1 AUTOMATIC SALT ELECTROLYSIS WATER TREATMENT SYSTEM Installation Instructions User Guide Please read carefully and keep available for later use Version 11 2013 SR 12 163 4GB STÉRILOR Sel ...

Page 2: ...2 ...

Page 3: ...r a long time for optimised installation and operation of all of the equipment for your new electrolyser Read it carefully before use in order to fully benefit from all of its functions By using STERILOR Sel with a pH that is well regulated around 7 your pool s water will be perfectly disinfected You can regulate your pH manually or automatically by having a STERILOR pH installed USEFUL ADDRESS Yo...

Page 4: ...f the box 8 2 1 4 Lateral sides of the box 9 3 INSTALLATION 9 3 1 Control box 10 3 1 1 Location attachments 10 3 1 2 Location 10 3 1 3 Electric connections 10 3 2 Electrolysis cell 12 3 3 Cover Connection or Servocontrol 12 3 4 Flow rate detector 13 4 USE 14 4 1 Memo 14 4 1 1 pH 14 4 1 2 Chlorine 14 4 1 3 Salt 14 4 1 4 Stabiliser 15 ...

Page 5: ...aying the change in polarity 16 4 4 2 Operating the change in polarity 16 4 5 Displaying device operating time and hours 17 4 6 Cover servocontrol Slow mode 17 4 6 1 Displaying and operating the Slow Mode 17 4 6 2 Manual setting of the production percentage with the cover in closed position 18 4 7 Servocontrol to a chlorine analysis 18 4 8 Displaying the diagnoses 19 5 WINTERISATION 20 6 EARTHING ...

Page 6: ...ctrolysis cell When adding salt for the first time in the pool or on each addition the box and STERILOR Sel must be switched off for 24 hours so that the salt is totally dissolved Thedevice must be stopped as soon as the water temperature falls below 15 C Effectively at this water temperature the titanium electrodes coated with precious metal oxides produce more oxygen and hydrogen than chlorine D...

Page 7: ...ts you from having to add chlorinated products All you have to do is maintain the water s pH between 6 9 and 7 4 STERILOR Sel is compatible with all current swimming pool liners and it adapts to any existing or new filtration systems Warning Salt is incompatible with metal filtration systems When adding salt to the pool for the first time or during each subsequent addition STERILOR Sel must be swi...

Page 8: ...between 0 and 65 Display of device operating time Time display Display of polarity and countdown of the polarity Forced Operation indicator Automatic Operation indicator Swimming pool inflow Swimming pool backflow Earth towards separate earthing rod Towards drains Towards booster compressor heating robot Filtration box pH liquid injection salt electrolysis cell installed STERILOR Sel GENERAL PRESE...

Page 9: ... thoroughly it is also advisable to replace the sand Connectors electrolysis cell cable General power supply fuse holder T 3 15 A ON OFF switch of the device Connection Cover or Servocontrol Connection Flow rate sensor Swimming pool inflow Swimming pool backflow Earth towards separate earthing rod Towards drains Towards booster compressor heating robot Filtration box pH liquid injection salt elect...

Page 10: ...ng machine and 6 mm drill bit suitable for the support plugs supplied plastic expansion plugs to be adapted to the support if necessary Phillips screwdriver 3 1 3 Electric connections The system operates in parallel with the filtration pump It must operate at the same time as the filtration system A box continuously connected to a separate socket will annul the guarantee Before carrying out any el...

Page 11: ...ation box Three phase filtration box STERILOR Sel STERILOR Sel MONO Auto Op Forced Op Circuit breaker Contactor Clock NEUTRAL PUMP EARTH Auto Op Forced Op Circuit breaker Contactor Clock NEUTRAL PUMP EARTH 380 V THREE PHASE ...

Page 12: ...op This orientation ensures the evacuation of water that may appear on the cap condensation splashing etc Effectively the electrode connectors must not be in contact with water Non compliance with this guideline may result in premature corrosion of the connectors and premature deterioration of the cell Titanium electrodes coated with precious metal oxides Place the electrode with its seal in the e...

Page 13: ...on of flow It can be assembled on a horizontal or vertical pipe Vertically the flow rate must be as high as possible to deactivate the loss of flow information Be careful to allow the movement of the blade a 24 mm diameter hole must be made in the tube before positioning the saddle tee To ensure the watertightness of the saddle tee mark out the position of the saddle tee on the tube before install...

Page 14: ...nufacturers of these products 4 1 2 Chlorine The ideal active chlorine level is around 0 3 to 0 4 mg l ppm as soon as the water temperature reaches approximately 15 to 20 C Whenever the device is used with water that does not contain chlorine carry out manual chlorination For 100 m3 of water 300 g per day for 8 days 4 1 3 Salt The salt level must be 5 g l or 5 kg m3 The salt level should be analys...

Page 15: ...royed by UVs 4 2 Production setting 4 2 1 Displaying and adjusting the production The amount of Chlorine produced depends on the salt level water temperature and quality and the device s operating time i e the filtration time The consumption of chlorine depends on the water quality contamination of the pool its level of use the environment and the climatic conditions Average operating settings in ...

Page 16: ...shock treatment 4 3 2 Forced Operation activation and deactivation procedure The forced operation is activated by pressing on the Forced Operation key F key for 5 seconds The red Forced Operation light comes on and the Forced Operation text appears The production then changes to 200 Leave the equipment to operate for a maximum of 24 hours and carry out manual analysis of the level of chlorine in o...

Page 17: ...ime press on the H button hours minutes for 5 seconds the hours display flashes Press on or to change them Press again on H hours minutes and the minutes flash Press on or to change them Finally press on H to store the time in memory 4 6 Cover servocontrol Slow mode 4 6 1 Displaying and operating the Slow Mode STERILOR Sel is equipped with the Slow Mode option for modulating the production of chlo...

Page 18: ...left hand lateral side of the device Activation of the Chlorine Regulation mode Press on the and keys at the same time until the bubbles around the Chlorine production text disappear the chlorine measurement servocontrol mode is activated Active chlorine Servocontrol mode Inactive chlorine Servocontrol mode When the chlorine analysis redox or other is below the threshold configured the Electrolyse...

Page 19: ... This analysis appears when the device recognises poor conductivity between the electrodes It then displays on the chlorine production display The cell is disconnected or not connected properly or oxidised Check the connection The electrodes are scaled up Clean the electrodes ACIDULOR recommended cleaning fluid The amount of salt in the water is too low Check the salt level 5g l D0033 After 6 000 ...

Page 20: ... ABS or other plastics The linings are often made of polyester PVC liner or painted These types of swimming pools of which all of the components are made of plastic have the characteristic of storing static electricity Also the pump turbines create fairly significant static currents A filtration pump thus creates a variable voltage of approximately 3 to 4 Volts The same applies for counter current...

Page 21: ...fore any intervention However periodic cleaning of the equipment with a dry cloth is recommended do not use aggressive chemicals that could damage the equipment particularly on the transparent part of the front face As with all electrical equipment a certain number of periodic checks must be carried out every quarter check of the electrical connections check of the conditions of the cables 8 STORA...

Page 22: ...This device is guaranteed against any manufacturing defect for 3 years from the delivery date The user must contact his retailer according to the after sales service procedure Cut off the guarantee card opposite without forgetting to make a copy before sending it duly completed to the following address The guarantee card below must be returned to us no later than 15 days after commissioning of the...

Page 23: ...must be provided for the guarantee in order to be taken into account Pool volume m3 Water source Public supply Borehole Well Rain pH Regulated pH device Filtration flow rate m3 h Stabiliser ppm Treatment used TA Total Alkalinity French degrees Type of heating TH hardness measurement French degrees pH corrector product used Trade name Chemical nature Pool Indoor Outdoor Cover Shelter Automatic cove...

Reviews: